MODUHAUS DOCUMENTS TO PREPARE BEFORE CONTACTING COUNCIL Reviewed 1 August 2026 Use this checklist to organise an early planning conversation. Requirements vary by state, council, site, intended use and proposal. This checklist is general information only and is not legal, planning, building or certification advice. PROPERTY [ ] Full property address [ ] Current title and deposited plan or plan of subdivision [ ] Easements, covenants, restrictions or encumbrances [ ] Zoning and relevant planning controls [ ] Known overlays or hazards [ ] Details of any existing dwelling or other approved buildings PROJECT INTENT [ ] Intended use: primary home, secondary dwelling, office, studio or amenity [ ] Whether the structure will be fixed or genuinely moveable [ ] Whether it will be used for sleeping or long-term occupation [ ] Proposed floor area, bedrooms, bathrooms and occupants [ ] Preferred ModuHaus model or approximate size [ ] Expected project timing SITE INFORMATION [ ] Current feature and level survey, if available [ ] Preliminary site plan with boundaries and setbacks [ ] Vehicle, truck and crane access [ ] Slope, retaining and known ground conditions [ ] Bushfire, flood, heritage or environmental information [ ] Existing trees, waterways and neighbouring buildings SERVICES [ ] Water connection or water-supply strategy [ ] Sewer connection or on-site wastewater strategy [ ] Stormwater and legal discharge information [ ] Electricity and telecommunications [ ] Gas, if relevant [ ] Firefighting water and emergency access, if relevant PRODUCT AND TECHNICAL INFORMATION [ ] Floor plans and elevations [ ] Proposed building classification and intended use [ ] Manufacturer structural and engineering information [ ] Energy-efficiency or sustainability documentation [ ] Proposed footing, foundation and tie-down system [ ] Installation, delivery and lifting method QUESTIONS TO ASK [ ] Is the proposed use permitted on this land? [ ] Is planning approval, a DA, CDC or other permit required? [ ] Is a building permit or construction certificate required? [ ] Which overlays, referrals or specialist reports apply? [ ] Are there local secondary-dwelling requirements? [ ] Are plumbing, wastewater or infrastructure approvals required? [ ] Who can confirm the building classification? [ ] What must be approved before manufacture, delivery and occupation? ModuHaus can help organise product fit, site access and early project information. Final requirements must be confirmed with the relevant council, planning authority, certifier, building surveyor and qualified professionals. ModuHaus Technologies Level 9/120 Sussex St, Sydney NSW 2000 info@moduhaus.au https://www.moduhaus.au