
Collection 21
30FT Class 1A Compact House - 2 Bedroom
Two-bedroom compact house
From$84,200AUD
Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

01 / The model
A more complete compact house pathway.
The 30FT Class 1A Compact House is intended for buyers seeking a more complete and compliance-conscious modular housing solution.
It is designed around a Class 1A certification pathway in relation to NCC and BCA requirements, subject to site-specific approvals, final documentation and intended use.
A compact home with documentation in mind.+
This model is positioned differently from a basic transportable shell. It is for buyers who need a more formal pathway, clearer documentation and a two-bedroom layout suited to residential planning.
Site conditions, overlays, access, installation method and local council requirements remain critical, so the enquiry process should begin before assumptions are made.
A suitable option where the project needs more than a basic pod or temporary unit.
Certification pathway+
Designed around a Class 1A pathway, subject to site-specific requirements.
Approx. 63 m2+
Expanded living area with two bedrooms, living, kitchen and bathroom.
Built-in planning+
Includes key furniture and utility planning in the source specification.
Installation clarity+
Requires a licensed builder or eligible owner-builder where permitted.
02 / Interior and details
A practical interior, ready to be resolved around your use.
The layout, inclusions and finish level can be reviewed during enquiry so the model is matched to the site, intended use and required service connections.



Floor planEvery metre, considered.+

Indicative floor plan supplied for 30FT Class 1A Compact House - 2 Bedroom.
03 / Specifications
The details that shape the model.
Core model information is kept visible for quick comparison. Final dimensions and documentation are confirmed during enquiry.
- Folded Size
- 9.0 m x 2.25 m x 2.9 m
- Shipping Size
- 9.0 m x 2.25 m x 2.9 m
- Expanded Size
- 9.0 m x 7.0 m x 2.9 m
- Living Area
- Approx. 63 m2
- Approx. Weight
- 10,000 kg
- Frame
- Galvanised steel structure
- Walls
- Metal carved panel + PU insulation board
- Layout
- 2 bedrooms, 1 living room, 1 kitchen, 1 bathroom
- Included Utilities / Furniture
- Cabinet, refrigerator cabinet, washing machine cabinet, bed, mattress, wardrobe, sofa
04 / What happens next
From first idea to moving day.
A guided journey, considered at every step.
How ModuHaus coordinates your projectEnquire
Tell us about your site, intended use and timing. We first confirm whether 30FT Class 1A Compact House - 2 Bedroom is a sensible product to assess further.
Review
We review product fit, access, services and the likely approval pathway, then identify the information still needed.
Proposal
You receive a clear scope covering the product, inclusions, delivery assumptions and the route to a site-specific quotation.
Delivery
Once documentation and responsibilities are confirmed, the factory, transport, site and installation pathway can be coordinated.
05 / Project essentials
The practical picture, in one place.
Standard inclusions
What affects final pricing
Product configuration and selected finishes
Site access, foundations and installation requirements
Delivery distance and transport constraints
Council, certification and service-connection requirements
Confirm before site readiness
Delivery & Installation
Most foldable and expandable units are delivered in a compact folded format for efficient transport, then opened and installed on site. Setup timing depends on access, model selection, site conditions and required trades; typical setup is reviewed during enquiry.
Utilities
Water, electrical, plumbing and other service connections must be completed by licensed trades. HVAC, solar and off-grid systems are planned separately unless specifically quoted.
Warranty & Support
Warranty and support terms should be confirmed before purchase. Current product guidance includes support for structure, weatherproofing, internal fittings and manufacturing defects.
Council & Compliance
This model is designed around a Class 1A certification pathway in relation to NCC and BCA requirements. Final approval depends on the site, local council, planning overlays, access, installation method and intended use. Additional reports, assessments or approvals may be required.
Approval guidance by state
Approval depends on location and intended use. Review the relevant state pathway before treating a model as suitable for a site.
06 / Product questions
Common questions, answered simply.
Is this automatically approved as a dwelling?+
No. It is designed around a certification pathway, but approval requirements vary by council, site and intended use.
Who can install it?+
Installation must be completed by a licensed builder, or an eligible owner-builder with the appropriate permit where permitted by law.
Choose your next step
Three clear ways to move forward.
Start broad, enquire about this model, or keep it in your project while you compare.
Not sure what fits?
Start the Planning Assessment
Clarify your site, intended use, budget and timing before choosing a model.
Know the product?
Send a guided enquiry
Share your location, timing and questions so the team can review this model in context.
Still comparing?
Save to My ModuHaus Project
Keep this model with your project and return when you are ready to ask questions.
Next Collection
12M Portable Granny Flat with 3 Bedrooms and Terrace
