
Collection 05
Premium Space 60 - Hamilton
60 m2 two-bedroom modular home
From$198,000AUD
Includes standard installation and site costs. Government fees, council approvals, service upgrades and project-specific requirements may vary.

01 / The model
More space, more privacy, more flexibility.
Premium Space 60 - Hamilton is designed for customers who need a larger modular home with stronger residential comfort.
With 60 m2 of space, two bedrooms, one bathroom, a full kitchen and a living area, Hamilton is suitable for families, downsizers, guest accommodation, lifestyle properties, secondary dwellings and longer-stay accommodation, subject to site review.
A larger plan with privacy built in.+
Hamilton places bedrooms on opposite sides of the plan, improving privacy and flexibility for couples, small families, visiting guests or shared accommodation.
The alfresco concept and full kitchen support a more complete living experience, while final inclusions, delivery and installation are confirmed before purchase.
Hamilton is the largest model in the Premium Modular Living trio, suited to customers who need a more complete two-bedroom modular home.
Two-bedroom flexibility+
A stronger fit for small families, visiting guests, shared stays or multi-generational accommodation.
Better privacy+
Bedrooms positioned on opposite sides help separate rest, work and hosting needs.
Longer-stay comfort+
A full kitchen, bathroom and living area support more settled residential use.
Lifestyle property fit+
The larger footprint can suit premium short-stay, rural, coastal or regional projects where the site allows.
02 / Interior and details
A more complete interior for everyday living.
Hamilton is planned for a full kitchen, full bathroom, living area and two bedrooms. Final finish level, appliance selection, air conditioning and electrical inclusions are confirmed through the contract.



Floor planEvery metre, considered.
03 / Specifications
The details that shape the model.
Core model information is kept visible for quick comparison. Final dimensions and documentation are confirmed during enquiry.
- Model code
- EG-60-01
- Collection
- Premium Modular Living
- Category
- Permanent Home / Premium Modular Home / Premium Space
- Area
- 60 m2
- Dimensions
- 12.1 m x 6.1 m
- Layout
- 2 bedrooms / 1 bathroom / 1 living area
- Designs in collection
- 10 designs available
- Collection flexibility
- Supports 2-4 bedroom and 1-3 bathroom options
- Indicative price
- From $198K + GST; includes standard installation and site costs. Government fees, council approvals, service upgrades and project-specific requirements may vary.
- Standard inclusions
- Full kitchen with dishwasher space, full bathroom, two 2.6 kW air-conditioning units, glass sliding doors, windows, LED downlights and power points may be included, subject to final contract confirmation
04 / What happens next
From first idea to moving day.
A guided journey, considered at every step.
How ModuHaus coordinates your projectShare your site
Tell us where the home may be placed, how it will be used and the timing you have in mind.
Review suitability
We review size, access, services, approvals and the supplier pathway before recommending next steps.
Shape the specification
Inclusions, upgrades, delivery scope and site-specific requirements are clarified before final pricing.
Confirm the pathway
Once scope is understood, the project can move toward proposal, contract confirmation and delivery planning.
05 / Project essentials
The practical picture, in one place.
Standard inclusions
Optional upgrades
Facade Upgrade - from $8K, subject to final availability, design compatibility and quotation
Green Energy - from $5K, including solar, battery, EV charging or smart meter options where suitable
Landscaping - from $6K, including garden design, decking, fencing or outdoor lighting where suitable
Kitchen & Bath - from $4K, including benchtop, tapware and shower upgrades where compatible
Appliances - from $3K, including selected kitchen, laundry or air-conditioning upgrades
Furniture Package - from $5K, subject to final styling scope and availability
Neural Hub - from $3K, smart home automation naming to be confirmed by ModuHaus before publishing
What affects final pricing
Location, delivery distance and access for trucks, crane or lifting equipment.
Ground conditions, site preparation, foundations and service connection requirements.
Council, zoning, overlays, documentation and approval pathway requirements.
Selected upgrades, finish level, appliances, furniture, landscaping and outdoor works.
Any additional site-specific works required before delivery or installation can proceed.
Final inclusions, delivery and installation scope confirmed in the contract.
Confirm before site readiness
Delivery & Installation
Hamilton's larger footprint may require more careful access, lifting and site-preparation review. Delivery and installation scope should be confirmed before purchase.
Utilities
Service connections, wastewater, power and other utilities must be confirmed for the specific site and completed by licensed trades where required.
Warranty & Support
The source material notes a 10-year structural warranty as a possible base-price inclusion. Final warranty terms must be confirmed in the contract.
Council & Compliance
Approval requirements vary by council, zoning and intended use. Suitability for secondary dwelling or residential use must be confirmed for the property.
Approval guidance by state
Approval depends on location and intended use. Review the relevant state pathway before treating a model as suitable for a site.
06 / Product questions
Common questions, answered simply.
Are site costs included?+
Site costs may vary. Final pricing depends on location, site access, ground conditions, service connections, council requirements, selected upgrades and any additional works required.
Are these homes suitable as secondary dwellings?+
They may suit secondary dwelling use depending on the property, council area, zoning, overlays and intended use. ModuHaus should review site requirements before suitability is confirmed.
Is council approval required?+
Approval requirements vary by council, zoning and intended use. The source material notes DA lodgement as a possible base-price inclusion, but the approval pathway should be confirmed for each site.
What is included in the base price?+
Base pricing may include design and engineering, council DA lodgement, factory construction, delivery to site, on-site installation, standard inclusions, quality inspections and a 10-year structural warranty, subject to final contract confirmation.
Can I upgrade finishes or energy systems?+
Optional upgrades may include facade, green energy, landscaping, kitchen and bathroom, appliances, furniture and smart home automation packages, subject to availability, design compatibility and quotation.
Choose your next step
Three clear ways to move forward.
Start broad, enquire about this model, or keep it in your project while you compare.
Not sure what fits?
Start the Planning Assessment
Clarify your site, intended use, budget and timing before choosing a model.
Know the product?
Send a guided enquiry
Share your location, timing and questions so the team can review this model in context.
Still comparing?
Save to My ModuHaus Project
Keep this model with your project and return when you are ready to ask questions.
Next Collection
4m Backyard Office Pod
