AI-assisted reference illustration of the black 20ft modular cabin trailer chassis

Trailer systems / Factory reference 233

20ft Modular Cabin Trailer

AI-assisted reference image; confirm equipment and geometry against current supplier drawings.

A welded 20ft chassis reference for modular cabins, studios and project-specific builds, with electric drum brakes and stabilising support points.

The platform

Start with the load case, not the catalogue label.

This chassis is a preliminary factory reference. A suitable package depends on the completed module, actual mass, load distribution, mounting method, towing arrangement and the Australian approval pathway.

Manufacturer terminology and dimensions are retained for review. They are not a statement that a completed trailer-and-cabin combination is registered or approved for Australian road use.

Side profile of the 20ft modular cabin trailer chassis

Platform reference

5,900 × 2,250mm

Aggregate trailer mass

4,500kg

Factory tare reference

1,230kg

Support points

4 + 6

Known specification

A clear reference for the first engineering conversation.

Values below reproduce the current manufacturer listing. Final production drawings, tolerances, component ratings and approval evidence remain to be checked in writing.

Manufacturer source
Trailer format
20ft × 7ft modular cabin chassis
Tow bar
920 × 120 × 50 × 5mm factory reference
Main beam
100 × 50 × 35mm factory reference
Axle
60mm solid axle reference
Suspension
9-leaf rocker roller
Brakes
12-inch electric drum brakes
Wheels and tyres
225/75-15
Guide wheel
10-inch rotating guide wheel
Finish
Sprayed black finish; colour described as customisable
Construction
Fully welded frame

Deployment reference

See the chassis before the cabin changes the picture.

The extended support arrangement is useful for discussing placement and stability, but support-leg quantity alone does not determine foundation or occupied-use suitability.

Trailer chassis with external stabilising supports extendedSupports deployed
Front view of the trailer chassis and support arms
Isolated studio view of the trailer chassis

Project fit

Three checks before this becomes your trailer.

01

Match the module

Confirm the completed cabin mass, mounting points, centre of gravity and required clearances against the chassis design.

02

Resolve the road package

Check axle loads, coupling, braking, tyres, lighting, dimensions and the intended towing and registration pathway.

03

Confirm the documents

Review current drawings, test evidence, VIN pathway, import approval and RAV requirements before supply is committed.

Three-quarter view of the 20ft trailer chassis

Current position

A candidate platform, pending the right evidence.

  • Factory dimensions and component references recorded
  • Pricing, lead time and final inclusions still to be confirmed
  • Compatibility depends on the completed module and load case
  • Australian import, RAV and registration pathway requires review
Project-specific configuration
Engineering review required
Price on request

Consultation

Start Your ModuHaus Consultation

Tell us about your vision and our team will help you find the most suitable modular living solution.

We’ll use your details to review your enquiry and contact you about your ModuHaus project. Your project details are not displayed publicly.

Step 1 of 617%

What best describes you? *