Editorial standards
How ModuHaus verifies product information.
This methodology explains how product dimensions, layouts, starting prices, images and limitations are turned into a clear public record without overstating what remains supplier- or site-specific.
Evidence hierarchy
Written records lead. Assumptions stay visible.
A product page is a useful starting point, not the project contract. When records disagree, the uncertainty is retained for written confirmation instead of being presented as settled fact.
- 01
Current supplier documents
Written quotations, inclusion schedules, specification sheets, warranty terms and certification evidence are treated as the primary product record when they are current and attributable to the relevant supplier.
- 02
Dimensioned plans and technical references
Floor plans, transport dimensions, expanded dimensions, weights and service layouts are checked against the latest available drawing set. Conflicts remain marked for written confirmation rather than being silently resolved.
- 03
Product imagery and configuration records
Images and configuration options help describe form, finish and layout direction. They are not treated as proof that every pictured finish, fixture or arrangement is included in the displayed starting price.
- 04
Site-specific professional confirmation
Planning, building, engineering, certification, delivery and installation conclusions belong to the responsible authority, appointed professionals and current project documents. Website content cannot replace those decisions.
Verification workflow
Six checks from source to published page.
The same workflow supports priority product pages, comparison pages and buyer guidance so dates and qualifications remain tied to the information they describe.
01
Collect
Gather the latest available quotation, plans, specification and product imagery.
02
Identify
Match the record to a stable product name, URL and catalogue identifier.
03
Normalise
Express dimensions, area, layout and price consistently without changing the underlying claim.
04
Qualify
Separate confirmed facts from indicative choices, supplier-dependent details and site-specific requirements.
05
Publish
Show the useful answer on the page with visible scope notes, source descriptions and review dates.
06
Recheck
Update the page when a material supplier record changes or a discrepancy is confirmed.
Language and scope
What our labels mean.
- Indicative product starting price
- The lowest currently displayed product-level reference. It is not a complete installed quotation and may not represent the configuration shown in every image.
- Complete project cost
- The broader project amount, which can include freight, placement, approvals, professional fees, foundations or supports, site work, services, installation and selected upgrades.
- Evidence reviewed
- The date on which available source material and missing confirmations were last assessed. Each item is marked supported, partially supported or awaiting a matching document. It does not mean every claim is confirmed or the site is approved.
- Updated
- The date the published page was materially changed. Formatting-only changes do not need to reset the underlying evidence-review date.
- Published plan direction
- A layout shown in the available product material. Final room dimensions, openings, circulation, privacy and service set-out still require current drawings and project review.
- Manufacturer or supplier status
- The legal manufacturer and contracting supplier are confirmed in current project documents. ModuHaus does not infer or publish a manufacturer relationship that has not been established in writing.
Responsibilities
Clear information needs clear ownership.
ModuHaus
Curates the product record, explains the published starting point, identifies open questions and helps shape a clearer enquiry or project brief.
Supplier or manufacturer
Confirms current drawings, inclusions, specification, production scope, certification evidence, warranty terms, availability and final written pricing.
Project professionals
Engineers, designers, builders, certifiers and other appointed professionals confirm the technical work within their qualifications and project responsibilities.
Authority and site owner
The responsible authority determines the applicable pathway, while the owner or applicant provides accurate site, title, access, service and intended-use information.
Where this applies
Product records and comparisons use the same standard.
Product pages show scope qualifications and evidence-review dates; comparison pages also describe their sources. Modification dates are recorded in metadata and the sitemap. A final supplier or site decision still belongs in current written project documents.
Common questions
Reading product information with the right context.
Does an evidence review mean a product is approved for my property?Open
No. An evidence review identifies what available documents support and what still needs confirmation. Planning, building, siting, servicing and occupancy requirements remain specific to the property and intended use.
Why can a larger product show a lower starting price?Open
Displayed starting prices can come from different supplier scopes, inclusions, finish levels and quotation dates. They are product-level references, not automatically like-for-like project quotations. Written inclusions and complete project costs must be compared separately.
Are rendered or supplier images proof of the final inclusion list?Open
No. Images can show design direction, optional finishes or a representative setting. The current written quotation, specification and inclusion schedule govern what is supplied for a project.
How often is product information reviewed?Open
Priority pages are reviewed when material supplier information changes, when a discrepancy is identified and during scheduled catalogue checks. Product pages show evidence-review dates; page modification dates are recorded in metadata and the sitemap. Comparison pages also display their updated dates.
How can I report a possible product-data error?Open
Send the page URL, the disputed statement and any supporting document through the ModuHaus contact page. Material corrections are checked against the relevant record before the page and its verification date are updated.
Corrections
Material corrections update the record.
When a supported correction changes a material product claim, the affected page, structured data and page-specific updated or evidence-review date are revised together. Historical marketing language is not allowed to override a newer written product record.
Report a product-data issuePlanning Assessment
Turn the published product record into a site-specific brief.
Share the property, intended use and access details so the open product, supplier and approval questions can be identified before commitment.