Illustrative charcoal exterior visualization of The Horizon 40 in an Australian landscape

Generous expandable living

The Horizon 40

A 40ft expandable home with three no-cost floor plan choices and room for a broader family or project brief.

Product answers

The Horizon 40, in brief.

What is The Horizon 40 best suited to?

Larger family, accommodation or multi-room briefs that can use an approximately 74.10 m² expanded footprint and support the longer transport, placement and service requirements.

What type of product is it?

It is a 40ft expandable modular-home product that travels compact and opens into a wider on-site envelope.

Which floor plans are currently shown?

Published options show two bedrooms, three bedrooms, and a three-bedroom direction with two bathrooms. Matching supplier drawings and bathroom inclusions still need confirmation.

What does the starting price cover?

The displayed figure is an indicative product starting price. Freight, placement, foundations, site work, approvals, professional fees, service connections and optional upgrades remain separate unless a current written quotation expressly includes them.

Where should NSW or Victoria approval checks begin?

Start with the intended use and property address. Review the relevant NSW or Victorian planning pathway, then confirm building, siting, access, foundation and service requirements with the responsible authority and qualified project team.

How does it differ from The Span 30?

The Horizon 40 has the larger nominal area and a published dual-bathroom plan direction, pending supplier confirmation. The Span 30 is the more compact family format and may be easier to test against constrained access or a smaller usable site area.

Compare The Horizon 40 with The Span 30
Planning and cost guides

Published product information is checked against available supplier material. Where a source does not establish a price or configuration, that limitation is stated in the product information.

Product snapshot

Three layouts within one expanded footprint.

The supplied plans share the same nominal 11.8 × 6.28m expanded envelope. Room configuration can change without changing the starting product price.

Layouts

3

No added plan cost

Bedrooms

2 or 3

Choose by intended use

Bathrooms

1 or 2

Dual-bath plan available

Expanded floor area

74.10 m²

Nominal 11.8 × 6.28m footprint

Compact 11.8 × 2.25m nominal transport footprint

Three supplied layouts at the same starting product price

Two-bedroom and three-bedroom arrangements

Single- or dual-bathroom plan choices

Kitchen cabinetry and bathroom fixtures referenced in the supplier quotation

Product dossier

Compare your floor plans.

Compare the reference layouts and starting prices, then customise your chosen plan. Final dimensions, inclusions and site requirements are confirmed in writing.

Transport size
11,800 × 2,250 × 2,530mm
Expanded size
11,800 × 6,280 × 2,530mm
Expanded area
Approx. 74.10 m²
Transport weight
To be confirmed
Dimensions and quote checks

These are nominal supplier dimensions. Final tolerances, transport clearances, set-out and foundation information require current project documentation.

Transport size: Nominal L × W × H. Expanded size: Nominal L × W × H. Expanded area: Calculated from nominal footprint. Transport weight: Required before freight and lifting planning

  • Current engineering, glazing and electrical compliance evidence
  • Final dimensions, room set-out, openings and service locations
  • Transport weight, freight route, lifting and placement requirements
  • Confirmed inclusions, selected finishes and add-on availability
  • Site works, foundations, approvals and utility connections

Configure yours

Shape The Horizon around the way it needs to work.

Select a floor plan, finish direction and known add-ons. Your choices will be included with the quote request for a written, project-specific scope.

Layout

Choose one of three supplied arrangements without changing the starting product price.

Two-bedroom plan

2 bedrooms, 1 bathroom and open living

Two-bedroom plan isometric layout for The Horizon 40
Floor plan

Floor plan

Compare bedroom and bathroom capacity within the same nominal expanded footprint.

A clearer starting point

When should a buyer consider The Horizon 40?

The Horizon 40 is the larger expandable option for projects that need two or three bedrooms and up to two bathrooms within the supplied plan set. Its size can support a broader family or accommodation brief, but transport access, placement, engineering, approvals, services and the complete installed cost must be tested against the site.

Information status

Product details reviewed . Supplier documents support some format and dimension references; prices and model-specific details still require written confirmation.

  1. 01

    Match capacity to the brief

    Compare bedroom and bathroom count against occupants, privacy, circulation and the intended operating model.

  2. 02

    Check delivery before finishes

    The longer transport format makes route, turning space, lifting and on-site deployment early feasibility questions.

  3. 03

    Build the complete budget

    Keep the product starting price separate from freight, site works, foundations, permits, services and professional fees.

Scope language

Keep every choice in the right column.

Included

Shown in the current written supplier scope or reference material.

Optional

A requested upgrade or service that needs its own written quotation.

Site-specific

Transport, placement, connections and approval work assessed for the property.