20ft modular cabin trailer chassis in three-quarter view

Portable infrastructure

Trailer Systems

Compare chassis for tiny house and modular cabin projects. Request pricing and availability after reviewing your module, intended movement and Australian approval pathway.

Current range

Compare tiny house trailer chassis.

These are manufacturer chassis references for purchase enquiries, not finished homes or ready-to-register packages. Confirm pricing, availability, final mass, balance, mounting, road equipment, documentation and approvals for the completed project.

AI-assisted reference images are illustrative; confirm equipment and geometry against current supplier drawings.

20ft modular cabin trailer chassis in three-quarter view

Factory reference 233

20ft Modular Cabin Trailer

A 5,900 × 2,250mm platform reference with a 4,500kg manufacturer-stated ATM and stabilising support arrangement.

5,900 × 2,250mm platform
4,500kg ATM reference
1,230kg tare reference
Review this chassis
20ft extendable outrigger house trailer chassis

Factory reference 301

20ft Extendable Outrigger House Trailer

A fully welded 5,900 × 2,200mm internal platform with heavy-duty extendable outriggers and ten support points.

5,900 × 2,200mm platform
4,500kg ATM reference
1,350kg tare reference
Review this chassis
13.2m triple-axle house trailer chassis

Factory reference 205

13.2m Triple-Axle House Trailer

A super-long 11,800 × 2,270mm internal platform reference with three axles, eight support legs and an 8-tonne stated load capacity.

11,800 × 2,270mm platform
8-tonne load reference
3 × 4.5-tonne axle references
Review this chassis