The Meridian on a coastal headland at dusk, opened to the deck and ocean beyond

Collection 02

The Meridian

Two-bedroom permanent modular home

From$99,500AUD

Product price only. Site costs, installation, delivery, service connections, approval costs and government fees are quoted separately.

Enquire Now
View Specifications
Collection 02

Buyer summary

The practical details, before the deeper read.

Size and layout

Approx. 60 m² · 2 bedrooms · 1 bathroom

Best use

Permanent or second-home living

Starting price

From $99,500

Indicative only

Standard inclusions

Two-Bedroom Layout, Open Living & Kitchen, Full Bathroom, Kitchen Package

Exclusions, approval and site requirements

Key exclusions

Product price only. Site costs, installation, delivery, service connections, approval costs and government fees are quoted separately.

Approval pathway

The Meridian is proposed for permanent residential use. Obtain classification, engineering and approval documentation for the actual design and site. The approximate 60 m² listing is not proof of eligibility for a NSW or Victorian secondary-dwelling pathway.

Delivery and site requirements

Confirm transport dimensions, route and lifting arrangements with the supplier. Foundation design, site preparation and installation scope need a site-specific review.

The Meridian, in brief

What is known now, and what still needs checking.

This summary separates the published product information from the site, supplier and professional confirmations needed before a purchasing decision.

Answer 01

Who could The Meridian suit?

The Meridian could suit permanent or second-home living where a two-bedroom, one-bathroom layout of approximately 60 square metres fits the brief. Residential, rental or investment suitability still depends on the property, lawful use, approval pathway, services, access and a complete project budget rather than the product description alone.

Answer 02

Is the starting price the complete project cost?

No. The published starting price is for the product scope. Foundations, site works, transport, lifting, installation, connections, approvals, professional fees, external works and upgrades may sit outside it.

Review NSW and Victoria budget scope

Answer 03

What information is currently confirmed?

The current listing describes a two-bedroom, one-bathroom layout of approximately 60 square metres and an indicative product-only starting price. The floor plan remains indicative.

Answer 04

What must the supplier and project team confirm?

Confirm current dimensioned drawings, inclusions, engineering and certification evidence, transport dimensions, foundations, installation responsibilities, service locations, warranty terms and the final written price for the actual site.

The approximate area and permanent-home positioning are not evidence of approval or secondary-dwelling eligibility.

Last reviewed

8 September 2026

Publisher and reviewer

ModuHaus Editorial Team

Sources and scope

Published catalogue information is shown as current product information. Site outcomes and supplier documents remain confirmation items until provided in writing for the project.

The Meridian nestled into a landscaped garden, with timber soffits, a hanging chair and a stone path

01 / The model

A complete home, at a considered scale.

The Meridian is a permanent two-bedroom modular home of around 60 square metres — large enough to live in fully, restrained enough to sit gently on your land. A generous living and kitchen space anchors the plan, with two bedrooms and a dedicated bathroom held quietly to either side.

It is the step beyond a relocatable cabin: a more complete, more permanent home for full-time living, a second dwelling for family, or a considered addition to a lifestyle or investment property.

Permanence, drawn with restraint.+

The Meridian is proposed for permanent residential use. The applicable building classification, engineering and approval documents must be confirmed for your design and site; the listing is not evidence of certification.

The architecture stays calm and grounded: honest materials, a low and considered form, and a plan organised around how a day actually unfolds rather than how a floorplan looks.

Two bedrooms, a full bathroom and an open living heart give The Meridian the balance of a complete home — for families, guests, downsizers or longer-term tenants.

A second home, close to home+

A complete dwelling for ageing parents, grown children or guests — independence kept a few steps away.

A compact main residence+

Everything a household needs in a calm, efficient footprint that's gentle on the land and the budget.

A considered investment+

A permanent-pathway home suited to secondary-dwelling, rental or lifestyle-property planning.

Supplier pathway, clearly reviewed+

Product, delivery and setup details are confirmed through the relevant supplier or factory partner pathway before final decisions.

02 / Interior and details

A complete interior, resolved for daily life.

The layout, inclusions and finish level are confirmed during consultation so the home is matched to your site, intended use and the approvals it needs.

Open living, dining and kitchen with a sofa, round table and a wall of glass to the landscape
A calm bedroom with a sliding door framing the bush outlook
A tiled bathroom with a walk-in shower, timber vanity and round mirror

Two-bedroom granny flat floor plan

Two bedrooms, one bathroom and open living/kitchen space. A reference for granny flat or permanent-home planning, subject to site and approval review. Supporting drawings show front and side elevations.

Reference drawings only. Final dimensions and approval documents require confirmation.

03 / Specifications

The details that shape the model.

Core model information is kept visible for quick comparison. Final dimensions and documentation are confirmed during enquiry.

Configuration
2 bedrooms · 1 bathroom · living & kitchen
Internal area
Approx. 60 m²
Living & kitchen
Open-plan living and kitchen
Approach
Permanent modular construction
Pathway
Residential classification and approvals to be confirmed
Price scope
Product only; site costs quoted separately
Plan status
Indicative; request current dimensioned drawings

04 / What happens next

From first idea to moving day.

A guided journey, considered at every step.

How ModuHaus coordinates your project
  1. Enquire

    Tell us about your land, intended use and timing. We confirm whether The Meridian is the right beginning.

  2. Consult

    We review site access, services and the approval pathway together, and shape the home around how you'll live.

  3. Proposal

    You receive a clear, itemised proposal — inclusions, delivery and the route to approval — with no surprises.

  4. Delivery

    Once project details are confirmed, the relevant supplier or factory partner confirms delivery, connection and finishing requirements.

05 / Project essentials

The practical picture, in one place.

Standard inclusions

Two-Bedroom LayoutOpen Living & KitchenFull BathroomKitchen PackageDouble-Glazed WindowsLED DownlightsPermanent-Pathway Design

Choose your next step

Three clear ways to move forward.

Start broad, enquire about this model, or keep it in your project while you compare.

Not sure what fits?

Start the Planning Assessment

Clarify your site, intended use, budget and timing before choosing a model.

Start Assessment

Know the product?

Send a guided enquiry

Share your location, timing and questions so the team can review this model in context.

Still comparing?

Save to My ModuHaus Project

Keep this model with your project and return when you are ready to ask questions.

Next Collection

Compact Living 30 - Manly

→
Compact Living 30 - Manly modular home with warm exterior finishes and garden outlook