
Collection 03
Compact Living 30 - Manly
30 m2 compact modular home
From$145,000AUD
Includes standard installation and site costs. Government fees, council approvals, service upgrades and project-specific requirements may vary.

01 / The model
Compact living, resolved with care.
Compact Living 30 - Manly is designed for customers who need a smaller modular home without losing comfort, presentation or everyday functionality.
With a 30 m2 footprint, one bedroom, one bathroom and one living area, Manly can support compact living, a backyard guest suite, private studio, short-stay accommodation concept or lifestyle-property retreat, subject to site-specific requirements.
A smaller footprint with a clear purpose.+
The Manly model uses a compact 5.1 m x 6.6 m footprint to create a self-contained space that feels calm, practical and easy to understand.
Optional deck and garage storage upgrades can improve outdoor usability and long-term storage, while final inclusions are confirmed through the project pathway.
Manly is a compact studio-style home for sites that need a complete but restrained modular footprint.
Compact secondary dwelling+
A smaller self-contained option for guest stays, family support or downsizer accommodation, subject to local requirements.
Studio or office flexibility+
The compact plan can support focused work, creative use or private retreat needs when residential use is not the only goal.
Short-stay potential+
A simple one-bedroom arrangement can suit lifestyle-property or weekender concepts where the site and approvals align.
Optional outdoor connection+
Deck and storage options can be considered where they suit the design, site and final quotation.
02 / Interior and details
Everything needed, kept close.
The interior is planned around a compact living rhythm: a bedroom, bathroom and living area supported by practical kitchen and comfort inclusions. Final finish level and layout details are confirmed before contract.



Floor planEvery metre, considered.
03 / Specifications
The details that shape the model.
Core model information is kept visible for quick comparison. Final dimensions and documentation are confirmed during enquiry.
- Model code
- EG-30-01
- Collection
- Premium Modular Living
- Category
- Permanent Home / Premium Modular Home / Compact Living
- Area
- 30 m2
- Dimensions
- 5.1 m x 6.6 m
- Layout
- 1 bedroom / 1 bathroom / 1 living area
- Designs in collection
- 7 designs available
- Indicative price
- From $145K + GST; includes standard installation and site costs. Government fees, council approvals, service upgrades and project-specific requirements may vary.
- Standard inclusions
- Kitchen package, bathroom package, 2.6 kW air conditioning, glazing, LED downlights and power points may be included, subject to final contract confirmation
04 / What happens next
From first idea to moving day.
A guided journey, considered at every step.
How ModuHaus coordinates your projectShare your site
Tell us where the home may be placed, how it will be used and the timing you have in mind.
Review suitability
We review size, access, services, approvals and the supplier pathway before recommending next steps.
Shape the specification
Inclusions, upgrades, delivery scope and site-specific requirements are clarified before final pricing.
Confirm the pathway
Once scope is understood, the project can move toward proposal, contract confirmation and delivery planning.
05 / Project essentials
The practical picture, in one place.
Standard inclusions
Optional upgrades
Facade Upgrade - from $8K, subject to final availability, design compatibility and quotation
Green Energy - from $5K, including solar, battery, EV charging or smart meter options where suitable
Landscaping - from $6K, including garden design, decking, fencing or outdoor lighting where suitable
Kitchen & Bath - from $4K, including benchtop, tapware and shower upgrades where compatible
Appliances - from $3K, including selected kitchen, laundry or air-conditioning upgrades
Furniture Package - from $5K, subject to final styling scope and availability
Neural Hub - from $3K, smart home automation naming to be confirmed by ModuHaus before publishing
What affects final pricing
Location, delivery distance and access for trucks, crane or lifting equipment.
Ground conditions, site preparation, foundations and service connection requirements.
Council, zoning, overlays, documentation and approval pathway requirements.
Selected upgrades, finish level, appliances, furniture, landscaping and outdoor works.
Any additional site-specific works required before delivery or installation can proceed.
Final inclusions, delivery and installation scope confirmed in the contract.
Confirm before site readiness
Delivery & Installation
Delivery and installation scope should be confirmed before purchase. Site access, lifting requirements, foundations and service connections may affect final project cost.
Utilities
Power, water, wastewater and other service connections must be reviewed for the specific site and completed by appropriately licensed trades where required.
Warranty & Support
The source material notes a 10-year structural warranty as a possible base-price inclusion. Final warranty terms must be confirmed in the contract.
Council & Compliance
Approval requirements vary by council, zoning and intended use. Do not assume approval is guaranteed or that no approval is required.
Approval guidance by state
Approval depends on location and intended use. Review the relevant state pathway before treating a model as suitable for a site.
06 / Product questions
Common questions, answered simply.
Are site costs included?+
Site costs may vary. Final pricing depends on location, site access, ground conditions, service connections, council requirements, selected upgrades and any additional works required.
Are these homes suitable as secondary dwellings?+
They may suit secondary dwelling use depending on the property, council area, zoning, overlays and intended use. ModuHaus should review site requirements before suitability is confirmed.
Is council approval required?+
Approval requirements vary by council, zoning and intended use. The source material notes DA lodgement as a possible base-price inclusion, but the approval pathway should be confirmed for each site.
What is included in the base price?+
Base pricing may include design and engineering, council DA lodgement, factory construction, delivery to site, on-site installation, standard inclusions, quality inspections and a 10-year structural warranty, subject to final contract confirmation.
Can I upgrade finishes or energy systems?+
Optional upgrades may include facade, green energy, landscaping, kitchen and bathroom, appliances, furniture and smart home automation packages, subject to availability, design compatibility and quotation.
Choose your next step
Three clear ways to move forward.
Start broad, enquire about this model, or keep it in your project while you compare.
Not sure what fits?
Start the Planning Assessment
Clarify your site, intended use, budget and timing before choosing a model.
Know the product?
Send a guided enquiry
Share your location, timing and questions so the team can review this model in context.
Still comparing?
Save to My ModuHaus Project
Keep this model with your project and return when you are ready to ask questions.
Next Collection
Family Comfort 45 - Bronte
