
Portable Homes
Portable Homes & Modular Buildings
Explore expandable homes, compact cabins, office pods and modular amenities. Compare formats, layouts and starting prices for your property or operation.
Browse products
Portable Homes & Modular Buildings range
14 models
Delivery, installation, site works, services and approvals depend on the project and written inclusions.
The Span 30
30ft configurable expandable home
- Starting price
- From $55,000 product only
- Floor area
- Approx. 56.52 m2
- Layout
- 2 or 3 bedrooms; 1 bathroom
Indicative product starting price, not a complete installed project cost.
Preliminary product price
Product details for The Span 30
- Best for
- Configurable compact living
A configurable 30ft expandable home with two-bedroom and three-bedroom layouts, plus visual finish and add-on selections.
The Cove Studio
20ft configurable holiday studio
- Starting price
- From $40,000 product only
- Floor area
- Approx. 36.74 m2
- Layout
- 1, 2 or 3 bedrooms; final set-out to confirm
Indicative product starting price, not a complete installed project cost.
1 bed from $40,000; 2 bed $42,000; 3 bed $43,000
Product details for The Cove Studio
- Format
- 20ft expandable module
- Best for
- Compact guest or holiday use
A configurable 20ft expandable home with three reference plan directions, plus visual finish selections.
The Halo 20
20ft portable studio pod with bathroom and kitchenette
- Starting price
- From $18,000 product only
- Floor area
- Approx. 13.0 m2
- Layout
- Open studio; 1 bathroom
Indicative product starting price, not a complete installed project cost.
Preliminary product price
Product details for The Halo 20
- Format
- 20ft single-piece cabin
- Best for
- Compact guest, work or short-stay briefs
A single-piece 20ft portable studio pod with a rounded glazed facade, kitchenette and private bathroom, from $18,000. Compare its open layout and finish options for your site.
The Vista 20
20ft panoramic studio cabin with bathroom and kitchenette
- Starting price
- From $19,500 product only
- Floor area
- Approx. 13.0 m2
- Layout
- Open studio; 1 bathroom
Indicative product starting price, not a complete installed project cost.
Preliminary product price
Product details for The Vista 20
- Format
- 20ft single-piece cabin
- Best for
- Panoramic guest, work or short-stay briefs
A single-piece 20ft portable studio cabin with panoramic glazing, kitchenette and private bathroom, from $19,500. Compare its open layout, outlook and privacy needs.
The Horizon 40
40ft configurable expandable home
- Starting price
- From $58,500 product only
- Floor area
- Approx. 74.10 m2
- Layout
- 2 or 3 bedrooms; 1 or 2 bathrooms
Indicative product starting price, not a complete installed project cost.
Preliminary product price
Product details for The Horizon 40
- Format
- 40ft expandable module
- Best for
- Larger family or project briefs
A configurable 40ft expandable home with two- and three-bedroom layouts, including a dual-bathroom plan, from $58,500.
4m Backyard Office Pod
Office pod with bed, bath & cabinetry
- Starting price
- From $16,854
- Configuration
- Bedroom · bathroom · study
- Footprint
- 3.9 × 2.2 m
Indicative product starting price, not a complete installed project cost.
Product details for 4m Backyard Office Pod
- Best for
- Backyard office
A compact, beautifully made room for the garden — a studio, an office or a quiet retreat, a few steps from the house.
3m Backyard Office Pod
Compact backyard office
- Starting price
- From $12,040
- Configuration
- Open studio · integrated joinery
- Footprint
- 2.9 × 2.2 m
Indicative product starting price, not a complete installed project cost.
Product details for 3m Backyard Office Pod
- Best for
- Backyard office
A compact, beautifully resolved room for the garden — the smallest way to give your work, or your quiet, a place of its own.
6m Backyard Office Pod
Backyard pod with bed, bath & kitchenette
- Starting price
- From $22,014
- Configuration
- Living · bathroom · kitchenette
- Footprint
- 6.0 × 2.2 m
Indicative product starting price, not a complete installed project cost.
Product details for 6m Backyard Office Pod
- Best for
- Premium backyard office
Our most generous standalone space — a fully serviced pod that moves easily between office, studio and a place to stay.
6m Push-Out Pod
Expandable pod — opens to 20 m²
- Starting price
- From $21,750
- Configuration
- Open-plan · expandable
- Footprint
- 5.9 × 2.2 m folded · ~20 m² open
Indicative product starting price, not a complete installed project cost.
Product details for 6m Push-Out Pod
- Best for
- Guest accommodation
A pod that travels compact and pushes out on site to twenty square metres — a complete small space for guests, work or a weekend away.
Single Toilet Block
Standalone single amenity
- Starting price
- From $4,200
- Configuration
- Single amenity
- Footprint
- 1.1 × 1.3 m
Indicative product starting price, not a complete installed project cost.
Product details for Single Toilet Block
- Best for
- Events & functions
A single portable toilet block for sites and rural properties needing a compact standalone facility, with placement and service connections confirmed for the project.
Double Toilet Block
Two independent amenities
- Starting price
- From $6,700
- Configuration
- Two independent compartments
- Footprint
- 2.2 × 1.3 m
Indicative product starting price, not a complete installed project cost.
Product details for Double Toilet Block
- Best for
- Higher-traffic events
A double portable toilet block with two independent compartments, for parks, farms and worksites assessing additional bathroom capacity.
Portable Toilet & Shower
Toilet & enclosed shower · side-by-side
- Starting price
- From $8,700
- Configuration
- Toilet + enclosed shower
- Footprint
- 2.16 × 1.30 m
Indicative product starting price, not a complete installed project cost.
Product details for Portable Toilet & Shower
- Approx. weight
- 490 kg
- Best for
- Construction sites
A portable bathroom for sale with separate toilet and shower compartments. Confirm hot water, connections and delivery for your site.
Accessible Portable Toilet
Wheelchair-accessible amenity
- Starting price
- From $12,430
- Configuration
- Accessible toilet
- Footprint
- 2.16 × 2.96 m
Indicative product starting price, not a complete installed project cost.
Product details for Accessible Portable Toilet
- Approx. weight
- 1,050 kg
- Best for
- Public & community facilities
A wider, open-plan unit designed around wheelchair access — more inclusive sanitation for public spaces, events and worksites.
The Atelier
Compact self-contained studio
- Starting price
- From $26,500
- Configuration
- Studio · 1 bathroom
- Area
- Approx. 13.5 m²
Indicative product starting price, not a complete installed project cost.
Product details for The Atelier
- Format
- One-piece studio, no unfolding
- Best for
- Home office
A compact, self-contained studio for work, guest use or retreat, subject to your site, installation and approval requirements. This model does not unfold.
Buying guide
Choose your portable pathway.
Compare the broader portable range in one place: expandable homes, single-piece compact cabins, office pods and modular amenity buildings. Each format is factory-built and transported to site, but intended use, future relocation, services and approval requirements still need to be confirmed for the selected product and property.
Accommodation settingsPortable cabins for parks, farms and short stays
Compare cabin layouts against the intended operation: caravan park guests, farm stays, staff accommodation or Airbnb-style short stays. A transportable product is not automatically suitable for every use, approved for a property or ready for off-grid operation.
The accommodation planning page compares these settings and links to service, rural-site and delivery guides.
- Guest cabins
- Review bedroom capacity, private bathrooms, kitchenette inclusions and cleaning access alongside the operating plan.
- Worker and remote-site proposals
- Define occupancy and stay duration, then review transport, power, water, wastewater and ongoing maintenance access.
The rangeWhat is a portable modular home or building?
Portable is the broad customer-facing category for structures manufactured off-site and transported to the property. It includes expandable homes, compact single-piece cabins, office pods and modular amenities.
Relocatable is a more specific project characteristic: it describes a structure designed and installed so it may be disconnected and moved again. Approval, finance and resale can vary with classification, services and how the product is installed on the site.
Terms that matterRelocatable, transportable or modular unit?
These terms overlap. The practical question is whether the home is designed to move again or to become a permanent installation.
- Transportable home
- A complete home transported by road and set down on site. It may be fixed permanently or installed for future relocation.
- Relocatable home
- Designed and installed so it may move again, with services and footings planned for disconnection and transport.
- Modular unit
- A self-contained modular building that may be a compact home, studio, office or secondary dwelling.
- Expandable home
- A home that arrives compact and opens or grows on site. Explore the dedicated Expandable Homes collection for this pathway.
Why consider itWhy choose a relocatable home?
The key benefit is flexibility. A relocatable format can suit changing land, work or family circumstances, staged development and projects where a permanent foundation is not the intended long-term outcome.
Like other modular pathways, controlled factory construction can happen while site access and services are prepared. The final setup still depends on delivery, foundations or supports, services and local requirements.
Approval and financeRelocatable home approvals in Australia
Requirements vary by state and council. A home installed permanently and connected to services may follow a different approval pathway from a genuinely movable dwelling. Occupation rules, classification and site controls should be checked before purchase.
Finance also depends on the lender and classification. The Planning Assessment and Council guide can help clarify the likely questions before you narrow the product conversation.
Planning next steps
Find the portable pathway that suits your site.
A Planning Assessment helps clarify intended use, access, services, budget and approval considerations before you commit to a product format.
Start a Planning AssessmentHow ModuHaus takes a project from brief to deliveryQuestions before you begin
Should I compare portable studios or expandable homes?
Start with your intended use, required rooms and delivery access. A compact studio may suit a separate workspace or smaller layout; an expandable home offers a different floor-plan format and needs space for its expanded footprint. Neither term confirms approval for living or rental use. Compare the actual layout, services and site requirements.
Compare portable studios and expandable homesHow much does a portable home cost in Australia?
Prices vary widely because this collection includes compact cabins, expandable homes, pods and amenity buildings. Product cards show the current starting price for each model. The complete project cost also depends on specification, site preparation, delivery, placement, approvals and service connections.
Compare product prices and project costsCan you finance a relocatable home in Australia?
Finance depends on classification and installation. A home installed as a fixed dwelling may follow a different lender pathway from a genuinely movable dwelling on a chassis. A broker experienced with modular and relocatable projects can help clarify the options.
Can a relocatable home be moved more than once?
It may be possible when the home was designed and installed for relocation. Each move needs safe disconnection, transport and reinstallation planning. Homes fixed permanently to foundations are generally more complex and costly to move.
Can a portable home be a granny flat?
Expandable models such as The Cove Studio, The Span 30 and The Horizon 40 can be considered for a secondary-dwelling brief. Compare the selected floor plan, kitchen and bathroom inclusions, delivery access and service connections. Living or rental use depends on the configuration, property and applicable approvals; not every pod or amenity building in this collection is a dwelling. Product starting prices are not complete installed granny-flat quotes.
Compare expandable layouts for a granny flat












