Layout
Studio
Open living and sleeping room

20ft panoramic studio pod
A fully customisable 20ft pod with panoramic glazing. Start with the illustrated layout, or shape the space around your own plans for work, guests or everyday use.
Product answers
Guest, work, recreation or site-specific short-stay briefs where daylight, outlook and a continuous glazed elevation are central to the room.
No. The Vista 20 is a single-piece portable panoramic studio with no on-site unfolding stage.
One open-studio plan is shown, with the bathroom, kitchenette and storage grouped into a compact service end beside the main glazed room.
The displayed figure is an indicative product starting price. Freight, placement, foundations, site work, approvals, professional fees, service connections and optional upgrades remain separate unless a current written quotation expressly includes them.
Start with the intended use and property address. Review the relevant NSW or Victorian planning pathway, then confirm building, siting, access, foundation and service requirements with the responsible authority and qualified project team.
Both are single-piece 20ft studios. The Vista places a continuous glazed elevation along the main room; the Halo uses a more front-focused rounded facade and a different internal arrangement.
Published product information is checked against available supplier material. Where a source does not establish a price or configuration, that limitation is stated in the product information.
Product snapshot
The reference plan keeps the bathroom and kitchenette together at one end, leaving the remaining room open for a bed, seating or workspace arrangement.
Layout
Studio
Open living and sleeping room
Bathroom
1
Shower, vanity and toilet referenced
Nominal footprint
13.0 m²
Approx. 5.806 × 2.236m
External height
2.53m
Nominal supplier dimension
Continuous full-height glazed elevation
Single-piece format with no unfolding stage
Open studio room with compact kitchenette
Separate bathroom with shower, vanity and toilet references
Shared Apple Cabin finish and comfort options
Product dossier
Review one system at a time. Each panel separates what the supplier document currently states from what still needs written evidence.

Confirm before quote
The drawing records the current nominal envelope and arrangement. Final tolerances, clearances and service set-out require current supplier documentation.
Nominal L × W × H
Nominal wet-area reference on plan
Generic quotation not matched to Vista; final schedule to confirm
Freight and lifting plan assessed separately
Around the home
The supplied imagery documents the continuous glazing, rounded white shell, cabinetry and bathroom arrangement. Loose furniture and styling remain illustrative unless included in writing.

Panoramic facade
Configure yours
Explore the reference layout, finishes and listed upgrades. For a different layout or fit-out, discuss a fully custom design with us.
Discuss a custom designLayout
Panoramic studio suite
Open room, kitchenette and 1 bathroom

A clearer starting point
The Vista 20 suits buyers seeking a single-piece portable studio with a panoramic glazed elevation for guest, work, recreation or site-specific short-stay use. The glazing changes the spatial experience, not the approval rules: intended use, privacy, orientation, access, foundations, services and the complete project cost still need property-specific review.
Information status
Product details reviewed . Supplier documents support some format and dimension references; prices and model-specific details still require written confirmation.
Test the glazed elevation against orientation, privacy, heat exposure and the way the main room will be used.
Do not assume a studio, office, guest room or short-stay use follows the same approval pathway as a dwelling.
Provide the site address, intended use, access information and service availability when requesting the written quote.
Scope language
Shown in the current written supplier scope or reference material.
A requested upgrade or service that needs its own written quotation.
Transport, placement, connections and approval work assessed for the property.