Layout
Studio
Open living and sleeping room

20ft portable studio cabin
A fully customisable 20ft pod with a rounded shell and full-height glazing. Start with the illustrated layout, or tell us how you want to use the space.
Product answers
Guest, work, recreation or site-specific short-stay briefs seeking a compact studio with a private bathroom and kitchenette reference.
No. The Halo 20 is a single-piece portable apple cabin studio with no on-site unfolding stage.
One open-studio plan is shown, grouping the kitchenette and bathroom at one end. The main room can support a sleeping, sitting or work arrangement subject to the final brief.
The displayed figure is an indicative product starting price. Freight, placement, foundations, site work, approvals, professional fees, service connections and optional upgrades remain separate unless a current written quotation expressly includes them.
Start with the intended use and property address. Review the relevant NSW or Victorian planning pathway, then confirm building, siting, access, foundation and service requirements with the responsible authority and qualified project team.
Both are single-piece 20ft studios. The Halo emphasises a rounded front facade and compact service end; The Vista is organised around a longer panoramic glazed elevation and a more linear interior outlook.
Published product information is checked against available supplier material. Where a source does not establish a price or configuration, that limitation is stated in the product information.
Product snapshot
The published reference plan groups the bathroom and kitchenette at one end, leaving the glazed main room open for a sleeping, sitting or work arrangement.
Layout
Studio
Open living and sleeping room
Bathroom
1
Shower, vanity and toilet referenced
Nominal footprint
13.0 m²
Approx. 5.806 × 2.236m
External height
2.53m
Nominal supplier dimension
Single-piece format with no unfolding stage
Full-height glazed facade with rounded corner detailing
Open studio room with a compact kitchenette
Separate bathroom with shower, vanity and toilet references
Ten supplied front and rear panel colours with black or white frames
Product dossier
Review one system at a time. Each panel separates what the supplier document currently states from what still needs written evidence.

Confirm before quote
The drawing records the current nominal envelope and internal arrangement. Final tolerances, clearances and set-out require current supplier documentation.
Nominal L × W × H
Nominal clear zone shown on plan
Fixture clearances require confirmation
Freight and lifting plan assessed separately
Around the home
The supplied imagery shows the rounded exterior, glazed entry, open room, kitchenette and bathroom details. Furniture and styling remain illustrative unless included in writing.

Glass facade
Configure yours
Explore the reference layout, finishes and listed upgrades. For a different layout or fit-out, discuss a fully custom design with us.
Discuss a custom designLayout
Open studio suite
Open room, kitchenette and 1 bathroom

A clearer starting point
The Halo 20 is a single-piece portable apple cabin for guest, work, recreation or site-specific short-stay briefs. It is not automatically approved as a dwelling because it includes a bathroom and kitchenette. The lawful use, planning and building pathway, access, foundations, services and total project cost must be confirmed for the property.
Information status
Product details reviewed . Supplier documents support some format and dimension references; prices and model-specific details still require written confirmation.
An office, guest studio, short-stay unit and permanent dwelling are not interchangeable approval descriptions.
Check transport access, foundation or support design, service connections and any lifting requirements for the site.
Treat the displayed price and specification as preliminary until supplier documents and project requirements are confirmed in writing.
Scope language
Shown in the current written supplier scope or reference material.
A requested upgrade or service that needs its own written quotation.
Transport, placement, connections and approval work assessed for the property.