The Haven set lightly into its landscape at golden hour

Collection 01

The Haven

Two-bedroom secondary dwelling

From$99,500AUD

Product price only. Site costs, installation, delivery, service connections, approval costs and government fees are quoted separately.

Enquire Now
View Specifications
Collection 01

Buyer summary

The practical details, before the deeper read.

Size and layout

Confirm during consultation · 2 bedrooms · bathroom TBC

Best use

Family, guests or a private retreat

Starting price

From $99,500

Indicative only

Standard inclusions

Kitchen Package, Bathroom Package, Double-Glazed Windows, Sliding Glass Doors

Exclusions, approval and site requirements

Key exclusions

Product price only. Site costs, installation, delivery, service connections, approval costs and government fees are quoted separately.

Approval pathway

Secondary-dwelling suitability is not established by the product name. Confirm planning, building documentation and intended use for your NSW or Victorian site before purchase.

Delivery and site requirements

Provide site photos, entry dimensions and the delivery address. Transport, lifting, foundations and installation scope need a site-specific quotation.

The Haven, in brief

What is known now, and what still needs checking.

This summary separates the published product information from the site, supplier and professional confirmations needed before a purchasing decision.

Answer 01

Who could The Haven suit?

The Haven could suit families planning a two-bedroom second home for relatives, guests or private work. Its suitability as a secondary dwelling, rental or business space is not established by the model name: the intended use, property controls, services, access and approval pathway must be checked for the actual site.

Answer 02

Is the advertised price the complete project cost?

No. The current price scope is product only. Site preparation, foundations, transport, lifting, installation, service connections, approvals, government fees and project-specific changes are separate unless a written quotation says otherwise.

Plan the complete budget

Answer 03

What information is currently confirmed?

The listing currently confirms a two-bedroom concept and product-only price scope. It does not confirm a dimensioned floor area, final bathroom configuration or a site approval outcome.

Answer 04

What must be confirmed before purchase?

Request the current dimensioned plan, inclusion and finish schedule, supplier certification evidence, transport and installation scope, service requirements, warranty terms and a site-specific written quotation.

No warranty duration, final certification package or approval outcome is represented as confirmed on this page.

Last reviewed

8 September 2026

Publisher and reviewer

ModuHaus Editorial Team

Sources and scope

Published catalogue information is shown as current product information. Site outcomes and supplier documents remain confirmation items until provided in writing for the project.

Warm timber, stone and natural light inside The Haven

01 / The model

A complete home, distilled to its essentials.

The Haven is a self-contained two-bedroom dwelling designed to live far larger than its footprint. It began with a simple question — how little does a complete home truly need? — and the answer was never less, but fewer. Fewer rooms, fewer decisions, each one considered until it feels inevitable.

Whether it becomes a home for ageing parents, a private retreat for grown children, a place for guests, or the studio your work has always deserved, The Haven holds its own quiet identity while sitting gently alongside the life you already have.

Designed around the rhythm of a day.+

We don't begin with a floorplan. We begin with the day — where the first light lands, where you'll pause with a coffee, how the afternoon settles into evening. The Haven is planned around that rhythm, so the architecture quietly serves the way you actually live.

Read from the garden, it resolves into one warm volume — honest materials, a low and grounded form, nothing performing for attention. Restraint, here, is the luxury.

A second dwelling changes what a property can hold. The Haven gives you space for the people and pursuits that matter — close enough to stay connected, separate enough to feel like its own world.

A second home, close to home+

Welcome family across generations — independence and togetherness, held a comfortable few steps apart.

Work, rest, retreat+

A studio, a guest house, a quiet escape. One considered space that adapts as your needs change.

Light that moves with you+

Oriented to your site so morning, afternoon and evening each find their own corner of the home.

Indoor and out, as one+

Living space opens fully to a covered deck, so the garden becomes the largest room in the house.

02 / Interior and details

Inside, everything softens.

Two bedrooms bracket a shared living heart, finished in warm, tactile materials and bathed in natural light. Generous ceilings lift the volume; wide glazing dissolves the threshold to the deck. By evening, the living space and the landscape read as one continuous room.

The open living and kitchen heart of The Haven
A calm, light-filled interior with timber detailing
A restful bedroom opening to greenery

03 / Specifications

The details that shape the model.

Core model information is kept visible for quick comparison. Final dimensions and documentation are confirmed during enquiry.

Bedrooms
2 bedrooms
Floor area
Dimensioned plan to be confirmed
Bathroom configuration
Confirm in the current layout schedule
Price scope
Product only; site costs quoted separately
Specification
Request the current finish and inclusion schedule
Approval status
Site-specific assessment required

04 / What happens next

From first idea to moving day.

A guided journey, considered at every step.

How ModuHaus coordinates your project
  1. Enquire

    Tell us about your site, intended use and timing. We first confirm whether The Haven is a sensible product to assess further.

  2. Review

    We review product fit, access, services and the likely approval pathway, then identify the information still needed.

  3. Proposal

    You receive a clear scope covering the product, inclusions, delivery assumptions and the route to a site-specific quotation.

  4. Delivery

    Once documentation and responsibilities are confirmed, the factory, transport, site and installation pathway can be coordinated.

05 / Project essentials

The practical picture, in one place.

Standard inclusions

Kitchen PackageBathroom PackageDouble-Glazed WindowsSliding Glass DoorsLED DownlightsPower PointsComposite Stone Benchtops

06 / Product questions

Common questions, answered simply.

Is there a confirmed floor area for The Haven?+

The current listing identifies two bedrooms, but does not establish a dimensioned floor area or final bathroom configuration. Request the current plan before checking setbacks or placing the home on a site plan.

Can The Haven be used for a rental or business project?+

This needs a site-specific review of lawful use, access, services and approval requirements. Rental demand, finance and project returns require separate assessment; the product listing does not establish investment feasibility.

Choose your next step

Three clear ways to move forward.

Start broad, enquire about this model, or keep it in your project while you compare.

Not sure what fits?

Start the Planning Assessment

Clarify your site, intended use, budget and timing before choosing a model.

Start Assessment

Know the product?

Send a guided enquiry

Share your location, timing and questions so the team can review this model in context.

Still comparing?

Save to My ModuHaus Project

Keep this model with your project and return when you are ready to ask questions.

Next Collection

The Meridian

→
The Meridian — a dark-clad two-bedroom modular home with a timber deck, set among coastal planting