Family Comfort 45 - Bronte modular home exterior with alfresco living connection

Collection 04

Family Comfort 45 - Bronte

Most popular 45 m2 modular home

From$168,000AUD

Includes standard installation and site costs. Government fees, council approvals, service upgrades and project-specific requirements may vary.

Enquire Now
View Specifications
Collection 04

Buyer summary

The practical details, before the deeper read.

Size and layout

45 m² · 1 bedroom · 1 bathroom

Best use

Secondary dwelling or downsizing

Starting price

From $168,000 + GST

Indicative only

Standard inclusions

One-Bedroom Layout, Full Kitchen With Appliances, Bathroom Package, 2 x 2.6 kW Air Conditioning

Exclusions, approval and site requirements

Key exclusions

Includes standard installation and site costs. Government fees, council approvals, service upgrades and project-specific requirements may vary.

Approval pathway

Council and approval requirements vary by location, zoning and intended use. DA lodgement may be part of base pricing where eligible, subject to final contract confirmation.

Delivery and site requirements

Delivery, on-site installation and any alfresco or external works should be confirmed during quotation. Site costs may vary.

Family Comfort 45 - Bronte lifestyle view showing a calm outdoor setting

01 / The model

A balanced middle option for compact living.

Family Comfort 45 - Bronte is designed for buyers who want more breathing room than a compact studio while keeping the footprint efficient and site-friendly.

With a 45 m2 layout, full kitchen, bathroom, living area and alfresco concept, Bronte is suited to guest accommodation, secondary dwellings, rental accommodation, downsizing and lifestyle properties, subject to site suitability and approvals.

Linear, practical and easy to place.+

The 10.5 m x 3.7 m form gives Bronte a clear, efficient layout that can be easier to understand early in planning.

The alfresco concept adds lifestyle value by extending daily living outdoors, while final delivery and installation scope should be confirmed before purchase.

Bronte is a strong all-rounder for customers comparing compact homes for longer stays, guest accommodation or secondary dwelling use.

A popular all-rounder+

A 45 m2 footprint gives more comfort than a studio without moving into a larger home scale.

Alfresco-ready living+

Outdoor connection can support entertaining, short-stay appeal and everyday lifestyle value.

Guest or downsizer fit+

The one-bedroom plan can suit premium guest stays, downsizing or compact long-stay living.

Flexible collection+

The collection supports 1-2 bedroom and 1-2 bathroom options, subject to final model availability.

02 / Interior and details

Practical comfort for longer stays.

Inside, Bronte is planned around a full kitchen, bathroom, living area and one-bedroom accommodation. Final fixtures, appliance selections and layout details are confirmed through quotation and contract.

Family Comfort 45 - Bronte open-plan living and kitchen interior
Family Comfort 45 - Bronte kitchen and interior finishes
Family Comfort 45 - Bronte bathroom and compact interior finish detail
Floor planEvery metre, considered.

03 / Specifications

The details that shape the model.

Core model information is kept visible for quick comparison. Final dimensions and documentation are confirmed during enquiry.

Model code
EG-45-01
Collection
Premium Modular Living
Category
Permanent Home / Premium Modular Home / Family Comfort
Area
45 m2
Dimensions
10.5 m x 3.7 m
Layout
1 bedroom / 1 bathroom / 1 living area
Designs in collection
8 designs available
Collection flexibility
Supports 1-2 bedroom and 1-2 bathroom options
Indicative price
From $168K + GST; includes standard installation and site costs. Government fees, council approvals, service upgrades and project-specific requirements may vary.
Standard inclusions
Full kitchen with appliances, bathroom package, two 2.6 kW air-conditioning units, glazing, LED downlights and power points may be included, subject to final contract confirmation

04 / What happens next

From first idea to moving day.

A guided journey, considered at every step.

How ModuHaus coordinates your project
  1. Share your site

    Tell us where the home may be placed, how it will be used and the timing you have in mind.

  2. Review suitability

    We review size, access, services, approvals and the supplier pathway before recommending next steps.

  3. Shape the specification

    Inclusions, upgrades, delivery scope and site-specific requirements are clarified before final pricing.

  4. Confirm the pathway

    Once scope is understood, the project can move toward proposal, contract confirmation and delivery planning.

05 / Project essentials

The practical picture, in one place.

Standard inclusions

One-Bedroom LayoutFull Kitchen With AppliancesBathroom Package2 x 2.6 kW Air ConditioningAlfresco-Ready ConceptLED DownlightsPower Points

06 / Product questions

Common questions, answered simply.

Are site costs included?+

Site costs may vary. Final pricing depends on location, site access, ground conditions, service connections, council requirements, selected upgrades and any additional works required.

Are these homes suitable as secondary dwellings?+

They may suit secondary dwelling use depending on the property, council area, zoning, overlays and intended use. ModuHaus should review site requirements before suitability is confirmed.

Is council approval required?+

Approval requirements vary by council, zoning and intended use. The source material notes DA lodgement as a possible base-price inclusion, but the approval pathway should be confirmed for each site.

What is included in the base price?+

Base pricing may include design and engineering, council DA lodgement, factory construction, delivery to site, on-site installation, standard inclusions, quality inspections and a 10-year structural warranty, subject to final contract confirmation.

Can I upgrade finishes or energy systems?+

Optional upgrades may include facade, green energy, landscaping, kitchen and bathroom, appliances, furniture and smart home automation packages, subject to availability, design compatibility and quotation.

Choose your next step

Three clear ways to move forward.

Start broad, enquire about this model, or keep it in your project while you compare.

Not sure what fits?

Start the Planning Assessment

Clarify your site, intended use, budget and timing before choosing a model.

Start Assessment

Know the product?

Send a guided enquiry

Share your location, timing and questions so the team can review this model in context.

Still comparing?

Save to My ModuHaus Project

Keep this model with your project and return when you are ready to ask questions.

Next Collection

Premium Space 60 - Hamilton

→
Premium Space 60 - Hamilton two-bedroom modular home with outdoor living area