AI-generated concept illustration of The Cove Studio on a 20ft outrigger trailer with entrance steps; final specifications and inclusions require confirmation

Special offer

The Cove Studio + trailer

Choose a one- or two-bedroom Cove Studio with a 20ft outrigger trailer, from $53,500. Final specifications and trailer compatibility require confirmation.

AI-generated concept illustration. Entrance steps are illustrative; final specifications and inclusions require confirmation.

Package offer

The Cove Studio + trailer

The Cove Studio expandable home included in the package
The Cove Studio
20ft Extendable Outrigger House Trailer included in the package
20ft outrigger trailer

Final package specifications depend on the selected layout, completed module weight and engineering review. Trailer compatibility and suitability for towing must be confirmed before order.

The Cove Studio (product from)$40,000
20ft outrigger trailer$16,000
Combined individual starting prices$56,000
Package discount-$2,500
Package offerFrom $53,500

AUD. Discounted package including the home and trailer. Freight, registration, approvals, site works, installation, connections and selected upgrades are not included; GST treatment and final inclusions require a written quote.

Configure yours

Choose your plan and finishes.

Choose a one- or two-bedroom plan, finishes and add-ons. The discounted package starts from $53,500 with the 20ft outrigger trailer included and a $2,500 discount. Compatibility and final scope require confirmation.

Layout

Choose the one- or two-bedroom plan for your package.

Open-living one-bedroom

1 bedroom, 1 bathroom and generous living.

Open-living one-bedroom isometric layout for The Cove Studio + 20ft Trailer
Floor plan

Floor plan

Both plans share the same nominal expanded footprint. Room sizes and openings require final drawings.

20ft Extendable Outrigger House Trailer chassis

Included trailer

20ft Extendable Outrigger House Trailer

A 20ft house-trailer chassis with extendable outrigger supports for an expandable-home setup. The final mounting arrangement, support positions and load capacity must be confirmed for The Cove Studio.

Cove transport width
2,250mm nominal
Trailer internal platform width
2,200mm reference
Trailer ATM / tare
4,500kg / 1,350kg reference

The stated platform is 50mm narrower than the Cove transport width. Mounting, support geometry, finished mass, load distribution, towing and Australian compliance must be checked before this can be offered as a compatible package.

View trailer details

Next step

Enquire about this package

Share your preferred plan and site location for a package quote. We will confirm the mounting requirements, final inclusions and delivery arrangements before order. Road registration and suitability for towing require separate confirmation.

Start a project enquiry