Layouts
3
One-, two- and three-bedroom plans

Compact studio collection
A configurable 20ft expandable format with three reference plan directions and a compact central service zone.
Product answers
Compact guest, holiday or flexible accommodation briefs where the approximately 36.74 m² expanded footprint, access and intended use can be supported by the site.
It is a compact 20ft expandable product. It opens on site and should not be confused with the single-piece Halo 20 or Vista 20 studios.
One-, two- and three-bedroom directions are shown as preliminary product choices. Final room dimensions, privacy, circulation and service set-out still require written confirmation.
The displayed figure is an indicative product starting price. Freight, placement, foundations, site work, approvals, professional fees, service connections and optional upgrades remain separate unless a current written quotation expressly includes them.
Start with the intended use and property address. Review the relevant NSW or Victorian planning pathway, then confirm building, siting, access, foundation and service requirements with the responsible authority and qualified project team.
The Cove Studio uses a shorter 20ft transport format and a smaller expanded footprint. The Span 30 provides a broader two- or three-bedroom envelope for projects needing more everyday living space.
Published product information is checked against available supplier material. Where a source does not establish a price or configuration, that limitation is stated in the product information.
Product snapshot
The updated plan set keeps the kitchen and bathroom near the central service zone while changing the room arrangement. Dimensions and room use remain nominal until final drawings are confirmed.
Layouts
3
One-, two- and three-bedroom plans
Bathroom
1
Vanity, shower and toilet
Expanded footprint
5.85 × 6.28m
Nominal updated plan set
Internal height
Approx. 2.23m
Confirm on final drawings
Integrated kitchenette along the service wall
Separate bathroom with three referenced fixtures
Double-glazed sliding windows with flyscreens referenced
Compact 20ft transport length with an expandable footprint
Exterior, flooring and wet-area palette choices
Product dossier
Compare the reference layouts and starting prices, then customise your chosen plan. Final dimensions, inclusions and site requirements are confirmed in writing.
From $40,000
Choose this layoutFrom $42,000
Choose this layoutFrom $43,000
Choose this layoutThis published reference illustrates the nominal envelope and service arrangement. A matching current supplier drawing, final set-out, clearances and openings still require confirmation.
Transport size: Nominal L × W × H. Expanded size: Nominal L × W × H. Internal height: Supplier reference. Plan choice: Final set-out requires written confirmation
Around the home
Reference imagery shows exterior and interior options. Porches, side entries, appliances, furniture and finishes shown require written inclusion confirmation.

Timber-look exterior
Configure yours
Choose the preferred palette and send it with the intended use and site details. Final inclusions and pricing are confirmed in writing.
Layout
Open-living one-bedroom
1 bedroom, 1 bathroom and generous living. From $40,000.

A clearer starting point
The Cove Studio is a compact 20ft expandable format for buyers comparing guest, holiday or flexible accommodation layouts. Its one-, two- and three-bedroom plans are preliminary product choices rather than approval outcomes. Confirm the proposed use, site access, local planning pathway, services and complete project budget before treating a selected plan as suitable.
Information status
Product details reviewed . Supplier documents support some format and dimension references; prices and model-specific details still require written confirmation.
Guest accommodation, holiday use and a permanent dwelling can follow different planning and building requirements.
Review the expanded footprint, setbacks, access, placement method and service locations against the property.
Send the preferred plan and finishes with the site address so inclusions and exclusions can be confirmed.
Scope language
Shown in the current written supplier scope or reference material.
A requested upgrade or service that needs its own written quotation.
Transport, placement, connections and approval work assessed for the property.