Layouts
2
Two- and three-bedroom options

Configurable compact living
A two-wing expandable home that travels compactly, then opens into a broader everyday floor plan.
Product answers
A two- or three-bedroom expandable-home brief where a compact 30ft transport form and an approximately 56.52 m² expanded footprint suit the site, access and intended use.
It is an expandable modular-home product. It travels in a compact format and opens on site; it is not a single-piece portable studio.
A two-bedroom plan and a three-bedroom plan are shown. Final room dimensions, circulation, openings and service set-out require current supplier drawings.
The displayed figure is an indicative product starting price. Freight, placement, foundations, site work, approvals, professional fees, service connections and optional upgrades remain separate unless a current written quotation expressly includes them.
Start with the intended use and property address. Review the relevant NSW or Victorian planning pathway, then confirm building, siting, access, foundation and service requirements with the responsible authority and qualified project team.
The Span 30 is the smaller expandable format. The Horizon 40 has a larger nominal footprint and shows a three-bedroom, two-bathroom direction; that configuration still needs supplier confirmation.
Published product information is checked against available supplier material. Where a source does not establish a price or configuration, that limitation is stated in the product information.
Product snapshot
These figures describe the current supplier reference, not an approved construction set. Site, freight and compliance decisions still require current documentation.
Layouts
2
Two- and three-bedroom options
Bathroom
1
Vanity, shower and toilet shown
Expanded floor area
56.52 m²
Nominal 9.0 × 6.28m footprint
Transport weight
Approx. 7,000kg
Confirm before freight planning
Compact 9.0 × 2.25m nominal transport footprint
Expandable side wings around a central service core
Kitchen cabinetry and full-length overhead cupboard referenced
Bathroom reference includes vanity, shower and toilet
Pitched roof, cladding, verandah and SPC flooring treated as separate options
Product dossier
Compare the reference layouts and starting prices, then customise your chosen plan. Final dimensions, inclusions and site requirements are confirmed in writing.
From $55,000
Choose this layoutFrom $55,000
Choose this layoutThe expandable structure changes width on site. Final tolerances, clearances and set-out information must come from current supplier drawings.
Transport size: Nominal L × W × H. Expanded size: Nominal L × W × H. Expanded area: Calculated from nominal footprint. Weight: Buyer-supplied reference; freight confirmation required
Around the home
Images illustrate finish and layout directions. Final inclusions, colours and fixtures are confirmed in the written project scope.

Charcoal retreat
Configure yours
Work through one decision group at a time. Your selections form a clearer enquiry brief, not an instant purchase price.
Exterior
A clearer starting point
The Span 30 suits buyers comparing a two- or three-bedroom expandable home with a compact transport form and a broader on-site footprint. It is a product starting point, not a complete installed-home price: intended use, land, access, approvals, services and installation still need to be assessed for the property.
Information status
Product details reviewed . Supplier documents support some format and dimension references; prices and model-specific details still require written confirmation.
Compare the two-bedroom and three-bedroom layouts before confirming room dimensions and circulation.
Check the NSW or Victorian planning pathway, site access, foundation approach and service availability early.
Use the configurator for the preliminary product scope; budget site work, freight, placement, approvals and connections separately.
Scope language
Shown in the current written supplier scope or reference material.
A requested upgrade or service that needs its own written quotation.
Transport, placement, connections and approval work assessed for the property.