Model comparison

20ft vs 30ft vs 40ft Expandable Homes

Transport length is only the starting point. The better size is the one that fits the intended use, expanded floor area, delivery path, site placement, services and complete project budget.

Editorial review 22 September 2026Updated 23 October 2026
The Cove Studio expandable modular home exterior by ModuHaus

20ft configurable holiday studio

The Cove Studio

The Span 30 expandable modular home exterior by ModuHaus

30ft configurable expandable home

The Span 30

The Horizon 40 expandable modular home exterior by ModuHaus

40ft configurable expandable home

The Horizon 40

Quick decision

Which model fits the brief?

Start with the 20ft Cove Studio for a compact flexible brief, the 30ft Span 30 for a more balanced family layout, and the 40ft Horizon 40 when larger living capacity or a two-bathroom direction is important. Then test the preferred format against the actual site.

Side-by-side

Compare the published starting points.

These are product-level references, not complete project quotations. Confirm current drawings, inclusions and site-specific scope before making a purchase decision.

Decision pointThe Cove StudioThe Span 30The Horizon 40
Reference modelThe Cove StudioThe Span 30The Horizon 40
Transport format20ft expandable module30ft expandable module40ft expandable module
Expanded areaApprox. 36.74 m2Approx. 56.52 m2Approx. 74.10 m2
Plans currently shown1, 2 or 3 bedrooms2 or 3 bedrooms2 or 3 bedrooms
BathroomsFinal set-out to confirm11 or 2, depending on plan
Indicative starting priceFrom $40,000 product onlyFrom $55,000 product onlyFrom $58,500 product only
Best starting pointCompact guest, holiday or flexible accommodationBalanced family living and regional projectsLarger family, accommodation or multi-room briefs

Choose The Cove Studio when

Keep the format compact.

  • The brief values the shortest transport format and smallest expanded footprint.
  • Guest, holiday or flexible accommodation is the primary use being tested.
  • One-, two- or compact three-bedroom plan directions are worth investigating.
  • The site and budget favour a smaller product starting point.
Explore The Cove Studio

Choose The Span 30 when

Balance space and access.

  • The project needs more everyday living space than the 20ft format provides.
  • A two- or three-bedroom family layout is the working brief.
  • Approximately 56.52 m2 is enough without moving to the longest format.
  • The 30ft transport and placement pathway suits the property.
Explore The Span 30

Choose The Horizon 40 when

Prioritise capacity.

  • The brief benefits from the largest published expanded area in this comparison.
  • A three-bedroom, two-bathroom direction is important.
  • The access and placement review can support the longer nominal transport form.
  • Room separation and multi-room capacity outweigh the value of a smaller format.
Explore The Horizon 40

Shared checks

What the model comparison cannot decide.

Product fit is only one part of the decision. These items remain specific to the property, supplier scope and intended use.

  1. 01The intended use and planning or building pathway for the property.
  2. 02Truck access, turning space, lifting or placement method and overhead constraints.
  3. 03The usable expanded footprint, setbacks, foundations, drainage and service routes.
  4. 04Current supplier drawings, inclusions, engineering evidence and written pricing.
  5. 05Freight, installation, approvals, professional fees and all other project costs.

Common questions

Before choosing a format.

Is a 40ft expandable home always better value than a 20ft or 30ft model?Open

No. Displayed starting prices are product-level references with different layouts, inclusions and supplier scopes. Complete value depends on the usable plan, freight, placement, site work, approvals, services and written final quotation.

Does 20ft, 30ft or 40ft describe the finished home size?Open

Not by itself. The label describes the nominal compact transport format. Each product opens into a larger on-site footprint, so compare the published expanded area and current drawings rather than relying on transport length alone.

Which expandable-home size is easiest to deliver?Open

A shorter format can simplify some access conditions, but delivery feasibility still depends on width, height, weight, turning space, gradients, overhead constraints and the proposed placement method. A site-specific access review is required.

Which size is suitable for permanent living?Open

Size alone does not establish lawful residential use. The proposed use, planning controls, building classification, certification evidence, siting and services must be confirmed for the property and selected product.

Evidence and scope

The Cove Studio

Evidence reviewed 22 September 2026 · 2 partial · 1 awaiting source

4 matters remain subject to supplier, project or site confirmation. Next review by 21 December 2026.

The Span 30

Evidence reviewed 22 September 2026 · 2 partial · 1 awaiting source

4 matters remain subject to supplier, project or site confirmation. Next review by 21 December 2026.

The Horizon 40

Evidence reviewed 22 September 2026 · 2 partial · 1 awaiting source

4 matters remain subject to supplier, project or site confirmation. Next review by 21 December 2026.

  • Undated 30ft and 40ft supplier quotations and generic 20ft catalogue; AUD price scopes remain unconfirmed
  • Supplier envelope dimensions for 30ft and 40ft; model-specific layout drawings pending
  • ModuHaus product configuration, pricing scope and site-review notes

This comparison is general product information, not planning, building, engineering, certification or financial advice. Product specifications and pricing can change. Confirm the current written supplier scope and requirements for the property before proceeding.

How product data is verified

Planning Assessment

Compare the site before committing to the model.

Share the property, intended use and access details so ModuHaus can help turn the preferred product into a clearer project brief.