
Collection 15
Double Toilet Block
Two independent amenities
From$6,700AUD
Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

01 / The model
Two independent toilet compartments.
The Double Toilet Block pairs two independent toilet compartments in one portable unit, each with a basin and ventilation. Assess the layout against peak demand and the facilities required for your site.
Assess the layout for farm worker facilities, caravan park amenities or worksites. Confirm water, power and wastewater connections; any proposed waste tank, servicing arrangement or remote-site setup needs separate supplier and site review.
Considered, even here.+
Two independent compartments share a steel frame and insulated panels. Review the current drawings, finishes and written supply scope before selecting the unit.
Plan access, water, wastewater and any electrical connections before placement.
A two-compartment amenity supplied assembled. Confirm site preparation, lifting and service connections before use.
Events & gatherings+
Review expected users, peak demand and cleaning arrangements for the event.
Sites & worksites+
Durable and dependable through daily, demanding use.
Remote properties+
Review service connections, any proposed waste tank and collection access before selecting a remote-site setup.
Site preparation+
Confirm access, supports, placement and service connections before delivery.
02 / Interior and details
Two compartments, well resolved.
Each compartment is fitted with a compact toilet, a basin with mixer tap and an exhaust fan — simple, clean and built to last, with the same considered finish across both.


Floor planEvery metre, considered.
04 / What happens next
From first idea to moving day.
A guided journey, considered at every step.
How ModuHaus coordinates your projectEnquire
Tell us about your site, intended use and timing. We first confirm whether Double Toilet Block is a sensible product to assess further.
Review
We review product fit, access, services and the likely approval pathway, then identify the information still needed.
Proposal
You receive a clear scope covering the product, inclusions, delivery assumptions and the route to a site-specific quotation.
Delivery
Once documentation and responsibilities are confirmed, the factory, transport, site and installation pathway can be coordinated.
05 / Project essentials
The practical picture, in one place.
Standard inclusions
Before you commit
Confirm the current drawings, finish schedule and written quote. Images do not establish included finishes or site suitability.
Double toilet or toilet-and-shower unit?
Separate toilet provision from shower needs and review the site's service brief.
Compare portable toilet and shower layouts
Review two toilet compartments against a combined toilet-and-shower unit and the site's user demand.
Plan park or farm accommodation facilities
Review private and shared facilities alongside your cabin and site brief.
What affects final pricing
Product configuration and selected finishes
Site access, foundations and installation requirements
Delivery distance and transport constraints
Council, certification and service-connection requirements
Confirm before site readiness
Utilities
Confirm water, power, wastewater and peak user demand before purchase. A waste tank or remote-site arrangement is not an assumed inclusion; confirm compatibility, collection access and servicing separately.
Approval guidance by state
Approval depends on location and intended use. Review the relevant state pathway before treating a model as suitable for a site.
Choose your next step
Three clear ways to move forward.
Start broad, enquire about this model, or keep it in your project while you compare.
Not sure what fits?
Start the Planning Assessment
Clarify your site, intended use, budget and timing before choosing a model.
Know the product?
Send a guided enquiry
Share your location, timing and questions so the team can review this model in context.
Still comparing?
Save to My ModuHaus Project
Keep this model with your project and return when you are ready to ask questions.
Next Collection
Portable Toilet & Shower
