
Collection 28
Portable Toilet & Shower
Toilet & enclosed shower · side-by-side
From$8,700AUD
Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

01 / The model
A toilet and shower in one unit.
The Portable Toilet & Shower is a compact bathroom unit available for purchase, with a private toilet and an enclosed shower in separate compartments. Compare it for farm facilities, parks or worksites where both functions are needed.
Review the reference plan, then request a quote identifying product inclusions, delivery, placement, hot-water provision and service connections for your site.
Built for the outdoors, finished for people.+
A galvanised steel frame and insulated panels stand up to weather and constant use, while clean, wear-resistant interiors keep the unit hygienic and simple to maintain.
Review the current drawings and finish schedule alongside your site requirements before confirming the supply and installation scope.
A separate bathroom unit for sites that need both toilet and shower facilities. Plan water, hot water, power and wastewater before delivery.
Worksites+
A durable toilet and shower for builders and contractors on active sites.
Events & parks+
Reliable facilities for festivals, markets and public outdoor spaces.
Campsites & glamping+
A wash facility to assess for campsites and guest stays, with water, energy and wastewater planned separately.
Connection planning+
Confirm connection points and responsibilities with the supplier and licensed trades.
02 / Interior and details
Compact, clean and easy to maintain.
Inside, the toilet and enclosed shower sit either side of the unit on hard-wearing PVC flooring, behind insulated panels built to handle constant, outdoor use.



Floor planEvery metre, considered.
Reference layout: separate toilet and shower compartments. Confirm final fixtures and dimensions before purchase.
03 / Specifications
The details that shape the model.
Core model information is kept visible for quick comparison. Final dimensions and documentation are confirmed during enquiry.
- Installed Size
- 2.16 m × 1.30 m × 2.36 m (W × L × H)
- Shipping Size
- 2.16 m × 1.30 m × 2.36 m
- Approx. Weight
- 490 kg per unit
- Frame
- Galvanised steel structure
- Walls
- 50 mm flame-retardant EPS insulated panels
- Flooring
- 2 mm wear-resistant PVC
- Door
- Outdoor-rated external door
- Finish
- White with black frame
- Connections
- Water, waste & power ready
04 / What happens next
From first idea to moving day.
A guided journey, considered at every step.
How ModuHaus coordinates your projectEnquire
Tell us about your site, intended use and timing. We first confirm whether Portable Toilet & Shower is a sensible product to assess further.
Review
We review product fit, access, services and the likely approval pathway, then identify the information still needed.
Proposal
You receive a clear scope covering the product, inclusions, delivery assumptions and the route to a site-specific quotation.
Delivery
Once documentation and responsibilities are confirmed, the factory, transport, site and installation pathway can be coordinated.
05 / Project essentials
The practical picture, in one place.
Standard inclusions
Before you commit
Confirm the current drawings, finish schedule and written quote. Images do not establish included finishes or site suitability.
Compare toilet blocks and toilet-and-shower units
Review the three facility layouts, current prices and service requirements before choosing.
View all four amenities layouts
Compare the full toilet and bathroom range, including the accessibility-focused option, before selecting a unit.
Plan accommodation facilities
Compare separate site facilities with private cabin bathrooms for your operating brief.
Optional upgrades
Alternative internal layout
Cabinetry
Built-in storage
Cladding & finish upgrades
What affects final pricing
Selected layout, finishes and written product inclusions.
Delivery distance, truck access, lifting and placement requirements.
Supports, site preparation, water, hot-water provision, wastewater and electrical connections.
Applicable site documentation and approvals; confirm GST treatment and the final itemised quote.
Confirm before site readiness
Delivery & Installation
Confirm the current lead time, truck access, ground preparation, supports and lifting requirements in your quote. A crane or forklift may be needed for placement. Installation timing depends on the site and service connections; no fixed setup period is assumed.
Utilities
Confirm water supply, hot-water equipment, power and wastewater treatment or collection for your site. Tanks and hot-water equipment are not assumed inclusions. Plumbing, drainage and electrical connections must be completed by licensed trades.
Warranty & Support
Indicative support covers the external structure and weatherproofing for 3 years and internal fittings for 1 year. Final warranty terms should be confirmed before purchase.
Council & Compliance
Installation, plumbing, drainage and local approval requirements vary by state, council and intended use. Please confirm the requirements for your site before purchase.
Approval guidance by state
Approval depends on location and intended use. Review the relevant state pathway before treating a model as suitable for a site.
06 / Product questions
Common questions, answered simply.
Does it include both a toilet and a shower?+
Yes — a private toilet and an enclosed shower sit side by side within one compact unit.
Does it arrive ready to use?+
No. The unit needs placement and site service connections before use. Confirm water, hot-water provision, power and wastewater arrangements, with plumbing and electrical work completed by licensed trades. Transportability does not make it off-grid.
What does the starting price cover?+
The displayed price is an indicative product starting point, not a complete installed bathroom price. Request an itemised quote confirming inclusions, GST treatment, freight, lifting, supports, site work and service connections for your location.
Choose your next step
Three clear ways to move forward.
Start broad, enquire about this model, or keep it in your project while you compare.
Not sure what fits?
Start the Planning Assessment
Clarify your site, intended use, budget and timing before choosing a model.
Know the product?
Send a guided enquiry
Share your location, timing and questions so the team can review this model in context.
Still comparing?
Save to My ModuHaus Project
Keep this model with your project and return when you are ready to ask questions.
Next Collection
Accessible Portable Toilet
