
Single Toilet Block
From $4,200 AUD
Preliminary product price, not an installed project total.
Start with a compact single amenity where a shower is not part of the brief.
View Single Toilet BlockAmenity selection / Australia
Choose a toilet block when the brief is toilet provision; compare a toilet-and-shower unit when separate washing facilities are also needed. A double toilet block has two toilet compartments, while the combined unit has a toilet and an enclosed shower. Neither layout establishes the number of users it can serve or the site's approval pathway.
Editorial review: 28 September 2026. Product data updated: 25 October 2026.

From $4,200 AUD
Preliminary product price, not an installed project total.
Start with a compact single amenity where a shower is not part of the brief.
View Single Toilet Block
From $6,700 AUD
Preliminary product price, not an installed project total.
Compare separate toilet compartments when additional toilet provision is the priority, rather than a shower.
View Double Toilet Block
From $8,700 AUD
Preliminary product price, not an installed project total.
Compare a side-by-side toilet and shower when people also need a dedicated wash facility.
View Portable Toilet & ShowerFootprints below are published product dimensions, not site clearances or installation envelopes. Confirm current drawings, inclusions and service interfaces before ordering.
Separate worker needs from farm-stay guest needs. Establish whether toilets alone are sufficient or showers are also required, then check year-round water, wastewater servicing and rural delivery access.
Farm accommodation planningCompare private cabin bathrooms with shared facilities. Peak demand, cleaning access and accessibility determine the brief; these compact units are not a specification for a complete high-capacity park ablution building.
Caravan park cabin and facility planningTransportability does not make a bathroom off-grid. Confirm potable water, hot water, power, wastewater treatment or collection, and maintenance access before selecting a unit. Mine-site suitability needs a separate technical and procurement review.
Remote accommodation and service planningDecide whether the guest brief calls for a private bathroom inside a cabin or a separate shared facility. A booking platform does not establish permission to operate, guest capacity or suitability of the installed unit.
Short-stay cabin and facility planningRecord who will use the facilities, expected peak use, toilet and shower needs, privacy and cleaning arrangements. Have required fixture provision assessed for the actual operation; no users-per-unit figure is assumed here.
Confirm the selected unit's connection points and written supply inclusions. Assess water pressure, storage, hot-water equipment and electrical loads separately. Tanks, heaters, solar and batteries are not assumed inclusions.
Confirm sewer connection or a separately assessed collection or treatment arrangement, including shower wastewater. Agree who installs, maintains and services it; a portable product does not establish treatment capacity.
Check truck and lifting access, placement dimensions, supports, ground preparation and connection responsibilities. Allow separately for freight, lifting, installation, services, documentation and any applicable approvals unless the quote expressly includes them.
Review the accessibility-focused layout separately, including approach paths, thresholds, circulation and fixtures. Product naming is not a compliance certificate.
Review the Accessible Portable ToiletThe Double Toilet Block has two independent toilet compartments. The Portable Toilet & Shower has a toilet and an enclosed shower in a side-by-side layout. A shower is not a second toilet, so choose by the facilities required rather than by footprint alone.
These are product supply and purchase pathways, not a short-term portable toilet hire catalogue. The current starting prices appear above and come from the product listings. Confirm the written inclusions and delivered project scope before budgeting.
No certified user capacity is stated in this comparison. Required toilet and shower provision depends on intended use, occupancy, peak demand and applicable project requirements. Have the site's facility provision assessed before deciding how many units to buy.
A remote farm proposal can be assessed, but the unit is not automatically off-grid. Confirm water, hot water, energy, wastewater treatment or collection, servicing and delivery access against the selected unit's written specification.
The starting price is product-level guidance, not an installed project quotation. Request an itemised quote identifying product inclusions, freight, lifting, supports, plumbing, electrical work, wastewater arrangements and any required site documentation.
No. An accessibility-focused layout is a starting point for assessment, not a compliance certificate. Check current drawings, fixtures, entry, circulation, approach paths and the applicable requirements with the relevant project advisers.
This comparison uses the current ModuHaus product listings for configuration, footprint and starting price. It is an editorial selection guide, not independent certification, a site approval or a complete engineering specification. Published information and pricing can change; request current supplier drawings and a written quote for your project.
How product data is verifiedAmenity project brief
Share your location, intended use, expected demand and available services so the product and installed scope can be reviewed together.