Couples and short stays
Compare bed placement, bathroom privacy, kitchenette scope, luggage storage and a practical cleaning route. Use the actual floor plan rather than the exterior photograph to assess usable space.

For park operators
Compare portable studios and expandable cabins for an existing caravan park or a proposed holiday park project. Start with your guest mix, approved site layout and service capacity, then assess the product, facilities and delivery window together.
A single-piece portable studio is a starting point for compact guest accommodation; an expandable home offers a different layout and delivery format for bookings needing separate bedrooms. Neither format is automatically suitable for your park. Compare the selected floor plan, proposed occupancy, installation documentation, site permissions and available services before ordering.
Content and source links checked 28 September 2026. Product suitability and site approvals remain project-specific. Setting images are illustrative, not completed-project evidence.
Compare bed placement, bathroom privacy, kitchenette scope, luggage storage and a practical cleaning route. Use the actual floor plan rather than the exterior photograph to assess usable space.
Separate bedrooms may matter more than a compact footprint. Review dining space, storage, circulation and bathroom access. A bedroom count is not a certified maximum guest capacity.
Do not carry the holiday guest brief into staff or longer-term accommodation unchanged. Recheck intended use, day-to-day living needs and the applicable site pathway with your advisers.
These are product starting points, not pre-approved site recommendations. Open each product for its floor plans, inclusions, starting-price scope and evidence notes.

From $18,000 AUD
Preliminary product price
A single-piece portable studio to compare for compact guest stays.
Review the studio floor plan, kitchenette and private bathroom inclusions; the 3D view is a visual reference, not an installation specification.
View product and floor plans
From $55,000 AUD
Preliminary product price
An expandable format with two- and three-bedroom plan directions to compare for separate sleeping spaces.
Review the selected plan, expanded placement footprint, deck scope and installation requirements before allocating a park site.
View product and floor plans
From $58,500 AUD
Preliminary product price
A larger expandable alternative when layout separation is a priority.
Compare the exact bathroom arrangement and available plot area; delivery access and utility demand need a site-specific review.
View product and floor plansCheck the selected product's bathroom and hot-water inclusions, simultaneous demand and connection scope. Additional private bathrooms still place demand on park water, electricity and wastewater systems.
The current amenities range includes compact toilet and toilet-and-shower units. It is not a complete specification for a large shared ablution building. Have peak demand, access, cleaning and required facility provision assessed before selecting a mix.
Consider paths, gradients, thresholds, parking, lighting and emergency access alongside the interior. An accessibility-focused product name does not certify the entire guest route or installed building.
Check the proposed cabin position against existing permissions, service routes, site circulation and any location-specific constraints. Resolve supports, foundations and connection responsibilities before manufacture is committed.
Map truck and lifting access separately from guest routes. Plan isolation areas, arrival communications and an installation window around your own booking calendar; factory manufacture does not eliminate site disruption.
Complete the required installation checks, service commissioning and operating arrangements before accepting guests. A staged order should only follow once the first-stage scope and future service capacity are clear.
Use the current product-page starting price as a reference, then request an itemised scope. Do not infer rental income, occupancy or investment returns from the cabin price.
Compare product and project costsStart with the park's current permissions and the proposed change, not an assumption that an existing park can add any cabin. NSW guidance identifies separate council activity approvals that can apply to park operation and installation. Its manufactured-home framework is undergoing changes, with commencement needing confirmation. Other states have their own pathways: ask the relevant council and appropriately qualified advisers to confirm the selected product and use.
Explore state and council starting pointsModuHaus product pages describe purchase and supply pathways, not a cabin hire catalogue. Availability, final specification, delivery and installation scope must be confirmed for the proposed park.
Do not assume a replacement keeps the same approval or service position. Confirm the revised footprint, use, occupancy, connections and installation requirements against the site's current permissions before selecting the larger product.
A portable studio and an expandable cabin have different layouts and transport formats. Compare guest needs, bedroom separation, bathroom arrangement, placement area and delivery access. The better fit depends on your site and operating brief, not the product category alone.
That needs an operational plan covering delivery and lifting zones, guest circulation, service interruptions and commissioning. Review the programme with the operator, installer and site advisers; a live park cannot be assumed to stay unaffected.
No. Read the selected product's price note and obtain a scoped quote. Transport, installation, site preparation, utility upgrades, approvals, decks and guest-ready furnishing may be separate. No occupancy or revenue forecast is implied by a product price.