AI-assisted reference illustration of the 3m Backyard Office Pod with its desk and chair visible through the doorway

Collection 05

3m Backyard Office Pod

Compact backyard office

From$12,040AUD

Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

Illustrative reference image; finishes and inclusions require written confirmation.

Enquire Now
All pod layouts
Collection 05

Buyer summary

The practical details, before the deeper read.

Size and layout

~6 m² · 1 office

Best use

Backyard office, Creative studio, Guest accommodation

Starting price

From $12,040

Indicative only

Standard inclusions

Built-in Desk & Cabinetry, Double-Glazed Windows, LED Downlights, Power Points

Exclusions, approval and site requirements

Key exclusions

Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

Approval pathway

Approval depends on intended use, location and classification. Confirm the pathway before committing.

Delivery and site requirements

Confirm vehicle or crane access, installation space, site preparation and service connections.

The precise, architectural form of the 3m Backyard Office Pod set into a garden

01 / The model

Small footprint, considered to the last detail.

The 3m Backyard Office Pod is the most distilled space in the collection — a single, calm room designed to drop into the garden and change how a day feels. With integrated cabinetry and good light, it asks for very little and gives back a great deal.

A focused office, a reading room, a place to make and think: it is proof that the smallest room, beautifully made, can be the most useful one you own.

Compare customisable Halo 20 and Vista 20
A room with one purpose.+

There is a particular calm to a space made for a single thing. The Office Pod is pared back to what matters — honest materials, soft natural light, and built-in joinery that keeps everything in its place.

It reads as architecture, not a shed: a precise little volume that belongs in the garden as naturally as a tree.

A dedicated room beyond the back door changes the rhythm of a day — somewhere to focus, host or simply slow down, without ever leaving home.

Work, without the commute+

A calm, separate office that begins and ends the day the moment you open or close the door.

A guest room when you need it+

Add a daybed and the same room becomes a quiet, private place for visitors to land.

Yours to reconfigure+

Office today, studio or reading retreat tomorrow — an open room that flexes with the seasons of life.

Comfortable all year+

Insulated panels and double-glazed glass keep it calm through summer heat and winter mornings alike.

02 / Interior and details

Calm, bright, and ready to use.

Inside, the 3m Backyard Office Pod is a single considered room — well lit, well proportioned, and finished with the same care as a whole home. A sculpted desk and integrated joinery do the quiet work, leaving the floor open and the mind clear.

Inside the pod — a wrap-around desk, integrated cabinetry and a soft office chair under warm lighting
A corner desk beneath a push-out window, finished in warm white joinery
The pod open to the garden, its interior glowing in the late afternoon light
Floor planEvery metre, considered.

Indicative layout — final dimensions confirmed in supplier plans

03 / Specifications

The details that shape the model.

Core model information is kept visible for quick comparison. Final dimensions and documentation are confirmed during enquiry.

Quiet, light-filled glazing
Double-glazed tempered glass and a wide doorway fill the room with daylight while keeping it calm and comfortable.
Fresh air & soft light
A side push-out window and an overhead spotlight bring in a breeze and a gentle glow whenever you need it.
Joinery that earns its place
An integrated desk and cabinetry keep everything in reach and the floor clear — storage without the clutter.
Ready to plug in
Pre-wired and electrical-ready, so a licensed connection is the only step between delivery and your first day.
Built for the outdoors
An insulated steel frame and sealed panels are made to weather Australian conditions, season after season.
Arrives complete
Delivered finished and set down gently — typically in a day, with minimal disruption to your garden.

04 / What happens next

From first idea to moving day.

A guided journey, considered at every step.

How ModuHaus coordinates your project
  1. Enquire

    Tell us about your site, intended use and timing. We first confirm whether 3m Backyard Office Pod is a sensible product to assess further.

  2. Review

    We review product fit, access, services and the likely approval pathway, then identify the information still needed.

  3. Proposal

    You receive a clear scope covering the product, inclusions, delivery assumptions and the route to a site-specific quotation.

  4. Delivery

    Once documentation and responsibilities are confirmed, the factory, transport, site and installation pathway can be coordinated.

05 / Project essentials

The practical picture, in one place.

Standard inclusions

Built-in Desk & CabinetryDouble-Glazed WindowsLED DownlightsPower Points

Download Brochure

3m Backyard Office Pod brochure

View reference layouts and specifications, then discuss the details of your project with ModuHaus.

Confirm current specifications and commercial terms before ordering. Brochure terms do not limit applicable consumer rights.

Download Brochure

Choose your next step

Three clear ways to move forward.

Start broad, enquire about this model, or keep it in your project while you compare.

Not sure what fits?

Start the Planning Assessment

Clarify your site, intended use, budget and timing before choosing a model.

Start Assessment

Know the product?

Send a guided enquiry

Share your location, timing and questions so the team can review this model in context.

Still comparing?

Save to My ModuHaus Project

Keep this model with your project and return when you are ready to ask questions.

Next Collection

6m Backyard Office Pod

→
6m Backyard Office Pod — a white garden pod with its kitchenette and bed visible through full-height glazing at golden hour