
Collection 30
The Atelier
Compact self-contained studio
From$26,500AUD
Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

01 / The model
A compact studio, delivered in one piece.
The Atelier is the simplest home in the range. There is nothing to unfold — it arrives as a finished, self-contained studio of around 13.5 square metres, ready to be levelled and connected to services.
Inside, a kitchenette, a full bathroom and a flexible living-sleeping space make it a genuine room of one's own: a home office, guest studio, weekender or quiet retreat at the end of the garden.
Small footprint, real presence.+
Compact does not mean compromised. The Atelier is fully fitted — durable flooring, double-glazed windows, soft-close joinery and a proper bathroom — so it feels like a considered space rather than a temporary box.
There is no unfolding step, but the delivery vehicle, lifting method, supports, services and completion requirements still need review. A compact footprint does not establish access to a tight site or permission to occupy.
Discuss studio, office, guest or weekender use against the actual design, site and approval pathway before ordering.
No unfolding+
Delivered in one piece, with site supports, installation and service connections reviewed separately.
Fully self-contained+
Kitchenette and full bathroom within a compact footprint.
Delivery access+
Review vehicle dimensions, gates, clearances, ground conditions and any lifting requirements.
A room of your own+
Office, studio, guest space or retreat, steps from the main home.
02 / Interior and details
A practical interior, ready to be resolved around your use.
The layout, inclusions and finish level can be reviewed during enquiry so the model is matched to the site, intended use and required service connections.



Floor planEvery metre, considered.
Indicative floor plan supplied for The Atelier.
03 / Specifications
The details that shape the model.
Core model information is kept visible for quick comparison. Final dimensions and documentation are confirmed during enquiry.
- Configuration
- Studio · kitchenette · bathroom
- Internal area
- Approx. 13.5 m²
- Footprint
- Approx. 5.85 m × 2.25 m
- Format
- One-piece studio, no unfolding
- Setup
- Confirm site supports, placement, services and completion requirements
04 / What happens next
From first idea to moving day.
A guided journey, considered at every step.
How ModuHaus coordinates your projectEnquire
Tell us about your land, intended use and timing. We confirm whether this model is a natural fit.
Consult
We review access, services and the approval pathway together, and shape the home around how you'll live.
Proposal
You receive a clear, itemised proposal — inclusions, delivery and the route to approval, with no surprises.
Delivery
Supplier, delivery and placement requirements are confirmed through project review, then connection is completed by licensed trades where required.
05 / Project essentials
The practical picture, in one place.
Standard inclusions
What affects final pricing
Your site — delivery access, ground conditions and how much site preparation is needed.
Service connections — bringing power, water and wastewater to the home, completed by licensed trades.
Council & approvals — the documentation and pathway your council, zoning and intended use require.
Configuration & finishes — layout adjustments, upgraded fixtures, cladding or interior options.
Delivery distance — freight from our partner facility to your land.
Outdoor & extras — decks, stairs, terraces, furniture or styling, where requested.
Confirm before site readiness
Delivery & Installation
The Atelier is delivered in one piece and does not unfold. Review vehicle access, lifting, site supports, service connections and required completion checks for your project; delivery does not establish permission to occupy.
Utilities
Water, electrical, plumbing and other service connections must be completed by licensed trades. HVAC, solar and off-grid systems are planned separately unless specifically quoted.
Warranty & Support
Warranty and support terms should be confirmed before purchase. Current product guidance includes support for structure, weatherproofing, internal fittings and manufacturing defects.
Council & Compliance
Approval requirements vary by council, site and intended use. Documentation can be reviewed during the enquiry process, and any final approvals, inspections or site-specific reports should be confirmed before purchase.
Approval guidance by state
Approval depends on location and intended use. Review the relevant state pathway before treating a model as suitable for a site.
06 / Product questions
Common questions, answered simply.
Does The Atelier expand or unfold?+
No. It arrives as a complete, self-contained studio. It is levelled on site and connected to services — there is no unfolding step.
Is it suitable as a home office or guest room?+
Yes. With a kitchenette and full bathroom in a compact footprint, it works well as an office, studio, guest room or weekender, subject to your site and local requirements.
Choose your next step
Three clear ways to move forward.
Start broad, enquire about this model, or keep it in your project while you compare.
Not sure what fits?
Start the Planning Assessment
Clarify your site, intended use, budget and timing before choosing a model.
Know the product?
Send a guided enquiry
Share your location, timing and questions so the team can review this model in context.
Still comparing?
Save to My ModuHaus Project
Keep this model with your project and return when you are ready to ask questions.
Next Collection
Bathroom Pods
