The 4m Backyard Office Pod set on a manicured lawn at golden hour, its rounded white form framed by trees

Collection 04

4m Backyard Office Pod

Office pod with bed, bath & cabinetry

From$16,854AUD

Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

Enquire Now
Collection 04

Buyer summary

The practical details, before the deeper read.

Size and layout

~8 m² · 1 bedroom · 1 bathroom

Best use

Backyard office, Guest accommodation, Airbnb / short-stay

Starting price

From $16,854

Indicative only

Standard inclusions

Kitchenette, Bathroom Package, Double-Glazed Windows, LED Downlights

Exclusions, approval and site requirements

Key exclusions

Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

Approval pathway

Approval depends on intended use, location and classification. Confirm the pathway before committing.

Delivery and site requirements

Confirm vehicle or crane access, installation space, site preparation and service connections.

The precise, architectural form of the 4m Backyard Office Pod settled into a garden

01 / The model

The room your home has been missing.

the 4m Backyard Office Pod is a small, self-contained room designed for the garden — a place to work, create or simply step away. It arrives complete and settles quietly at the end of the lawn, a considered space that feels a world apart while staying close to home.

Small in footprint, generous in calm: it is proof that a modest room, beautifully resolved, can change how a whole property feels.

Small footprint, considered to the last detail.+

A compact space leaves nowhere to hide, so every decision matters more. the 4m Backyard Office Pod is pared back to what earns its place — good light, honest materials, and a quiet that makes focus effortless.

It reads as architecture, not a shed: a precise little volume that belongs in the garden as naturally as a tree.

A dedicated room beyond the back door changes the rhythm of a day — a place to focus, create or retreat without leaving home.

Work, without the commute+

A calm, separate office that ends the day when you close the door.

Room to create+

A studio for making, music or quiet thought, away from the busy house.

A quiet retreat+

A guest room, reading room or escape — whatever the garden needs it to be.

Arrives complete+

Delivered finished and set down lightly, ready to use almost at once.

02 / Interior and details

Calm, bright, and ready to use.

Inside, the 4m Backyard Office Pod is a single considered room — well lit, well proportioned, and finished with the same care as a whole home. It feels settled and warm the moment you step in.

Inside the pod — a built-in desk, integrated cabinetry and an office chair beside full-height glazing
The pod's clean front elevation, glazed doors opening to the garden
The rounded-corner rear form of the pod amongst established planting
Floor planEvery metre, considered.

Indicative layout — final dimensions confirmed in supplier plans

03 / Specifications

The details that shape the model.

Core model information is kept visible for quick comparison. Final dimensions and documentation are confirmed during enquiry.

A complete ensuite, built in
A private shower and toilet with full plumbing make this a true guest space — not just a room with a desk.
A bed that appears when needed
A pull-out bed frame turns the studio into comfortable overnight accommodation in moments, then disappears by morning.
Storage, thoughtfully placed
Wall cabinets keep belongings tidy and the floor open, so a compact footprint never feels tight.
Comfortable in any climate
Insulated panels and double-glazed windows hold a calm, even temperature right through the seasons.
Ready to connect
Plumbing and electrical arrive pre-installed, so site setup is quick once licensed trades make the final connection.
Arrives complete
Delivered finished and placed gently — typically within a day of arriving on your land.

04 / What happens next

From first idea to moving day.

A guided journey, considered at every step.

How ModuHaus coordinates your project
  1. Enquire

    Tell us about your site, intended use and timing. We first confirm whether 4m Backyard Office Pod is a sensible product to assess further.

  2. Review

    We review product fit, access, services and the likely approval pathway, then identify the information still needed.

  3. Proposal

    You receive a clear scope covering the product, inclusions, delivery assumptions and the route to a site-specific quotation.

  4. Delivery

    Once documentation and responsibilities are confirmed, the factory, transport, site and installation pathway can be coordinated.

05 / Project essentials

The practical picture, in one place.

Standard inclusions

KitchenetteBathroom PackageDouble-Glazed WindowsLED DownlightsPower PointsPre-Plumbed & Wired

Download Brochure

4m Backyard Office Pod brochure

View reference layouts and specifications, then discuss the details of your project with ModuHaus.

Confirm current specifications and commercial terms before ordering. Brochure terms do not limit applicable consumer rights.

Download Brochure

Choose your next step

Three clear ways to move forward.

Start broad, enquire about this model, or keep it in your project while you compare.

Not sure what fits?

Start the Planning Assessment

Clarify your site, intended use, budget and timing before choosing a model.

Start Assessment

Know the product?

Send a guided enquiry

Share your location, timing and questions so the team can review this model in context.

Still comparing?

Save to My ModuHaus Project

Keep this model with your project and return when you are ready to ask questions.

Next Collection

3m Backyard Office Pod

→
3m Backyard Office Pod — a compact white garden studio with its desk and joinery visible through full-height glazing