A relocatable modular home opened and positioned on site

Relocatable Homes

Relocatable & Transportable Homes

Not every home needs to be fixed to one place forever. A relocatable home can provide the quality and finish of a permanent build with the option to move if circumstances change. ModuHaus relocatable and transportable homes are architect-designed, factory-built and delivered across Australia, with the right pathway shaped by your site and intended use.

Browse products

Relocatable & Transportable Homes range

22 models

The 4m Backyard Office Pod — a white garden studio with its home-office interior visible through full-height glazing

4m Backyard Office Pod

Office pod with bed, bath & cabinetry

Starting point

From$16,854

Best for

Backyard office

Configuration

Bedroom · bathroom · study

A compact, beautifully made room for the garden — a studio, an office or a quiet retreat, a few steps from the house.

Footprint

3.9 × 2.2 m

Collection

Pods

3m Backyard Office Pod — a compact white garden studio with its desk and joinery visible through full-height glazing

3m Backyard Office Pod

Compact backyard office

Starting point

From$12,040

Best for

Backyard office

Configuration

Open studio · integrated joinery

A compact, beautifully resolved room for the garden — the smallest way to give your work, or your quiet, a place of its own.

Footprint

2.9 × 2.2 m

Collection

Pods

6m Backyard Office Pod — a white garden pod with its kitchenette and bed visible through full-height glazing at golden hour

6m Backyard Office Pod

Backyard pod with bed, bath & kitchenette

Starting point

From$22,014

Best for

Premium backyard office

Configuration

Living · bathroom · kitchenette

Our most generous standalone space — a fully serviced pod that moves easily between office, studio and a place to stay.

Footprint

6.0 × 2.2 m

Collection

Pods

6m Push-Out Pod — a white expandable pod set on a forest-edge lawn

6m Push-Out Pod

Expandable pod — opens to 20 m²

Starting point

From$21,750

Best for

Guest accommodation

Configuration

Open-plan · expandable

A pod that travels compact and pushes out on site to twenty square metres — a complete small space for guests, work or a weekend away.

Footprint

5.9 × 2.2 m folded · ~20 m² open

Collection

Pods

Single Toilet Block — a self-contained amenity unit

Single Toilet Block

Standalone single amenity

Starting point

From$3,078

Best for

Events & functions

Configuration

Single amenity

A self-contained single amenity, built to last — a quietly considered solution for events, sites, and properties that need one done well.

Footprint

1.1 × 1.3 m

Collection

Toilets & Bathrooms

Double Toilet Block — a two-compartment amenity unit

Double Toilet Block

Two independent amenities

Starting point

From$5,507

Best for

Higher-traffic events

Configuration

Two independent compartments

Two independent amenities in a single, durable unit — a higher-capacity solution that still feels considered and well made.

Footprint

2.2 × 1.3 m

Collection

Toilets & Bathrooms

Portable Toilet & Shower — a combined amenity unit

Portable Toilet & Shower

Toilet & enclosed shower · side-by-side

Starting point

From$6,742

Best for

Construction sites

Configuration

Toilet + enclosed shower

A self-contained unit that pairs a private toilet with an enclosed shower — dependable comfort for sites, events and remote stays.

Footprint

2.16 × 1.30 m

Approx. weight

490 kg

Accessible Portable Toilet — a wheelchair-accessible amenity unit

Accessible Portable Toilet

Wheelchair-accessible amenity

Starting point

From$12,430

Best for

Public & community facilities

Configuration

Accessible toilet

A wider, open-plan unit designed around wheelchair access — more inclusive sanitation for public spaces, events and worksites.

Footprint

2.16 × 2.96 m

Approx. weight

1,050 kg

6M Container Home - Empty expandable modular home exterior by ModuHaus

6M Container Home - Empty

Flexible foldable home shell

Starting point

From$32,286

Best for

Guesthouse shell

Configuration

Empty shell

A flexible 6-metre foldable shell for customers who want a compact structure ready for a custom fit-out.

Footprint

5.96 m x 5.96 m expanded

Approx. weight

2,750 kg

13FT Container Office expandable modular home exterior by ModuHaus

13FT Container Office

Compact office pod with bathroom

Starting point

From$15,303

Best for

Backyard office

Configuration

Office pod with bathroom

A compact modular office pod with bathroom functionality for work, site use, guest stays or flexible backyard projects.

Area

Approx. 8 m2

Footprint

3.96 m x 2.22 m expanded

6M Container Home - 13FT with Bathroom expandable modular home exterior by ModuHaus

6M Container Home - 13FT with Bathroom

Compact foldable home with bathroom

Starting point

From$22,487

Best for

Guest suite

Configuration

Bathroom model

A compact foldable container home with bathroom functionality for guest stays, studio use, site accommodation or temporary living.

Area

Approx. 24 m2

Footprint

5.96 m x 4.00 m expanded

6M Container Home with 2 Bedrooms - Glass Curtain Wall expandable modular home exterior by ModuHaus

6M Container Home with 2 Bedrooms - Glass Curtain Wall

Two-bedroom home with glass wall

Starting point

From$38,964

Best for

Guest accommodation

Configuration

2 bedrooms

A compact two-bedroom expandable home with a glass curtain wall for stronger natural light and indoor-outdoor connection.

Area

Approx. 36 m2

Feature

Glass curtain wall

30FT Class 1A Compact House - 2 Bedroom expandable modular home exterior by ModuHaus

30FT Class 1A Compact House - 2 Bedroom

Two-bedroom compact house

Starting point

From$84,200

Best for

Residential planning

Configuration

2 bedrooms

A two-bedroom compact modular house designed around a Class 1A certification pathway, subject to site-specific approvals.

Area

Approx. 63 m2

Approval

Site-specific pathway

12M Portable Granny Flat with 3 Bedrooms and Terrace expandable modular home exterior by ModuHaus

12M Portable Granny Flat with 3 Bedrooms and Terrace

Three-bedroom expandable granny flat

Starting point

From$65,500

Best for

Family accommodation

Configuration

3 bedrooms

A spacious 12M foldable granny flat with three bedrooms, open kitchen, bathroom and terrace-ready planning.

Area

Approx. 72 m2

Outdoor

Terrace-ready

6M Container Home - 2 Bedroom with Terrace expandable modular home exterior by ModuHaus

6M Container Home - 2 Bedroom with Terrace

Two-bedroom expandable home with terrace options

Starting point

From$45,650

Best for

Guest accommodation

Configuration

2 bedrooms

A compact two-bedroom foldable home with kitchen, bathroom and terrace/canopy options for a stronger outdoor connection.

Area

Approx. 36 m2

Outdoor

Terrace/canopy options

6M Foldable Container Home - 6M-V4 expandable modular home exterior by ModuHaus

6M Foldable Container Home - 6M-V4

Raw foldable structure

Starting point

From$19,949

Best for

Studio

Configuration

Raw foldable shell

A compact 6M foldable structure for storage, office, studio, workshop or basic accommodation planning.

Footprint

5.85 m x 4.8 m expanded

Model

0208

6M Container Home - Open Space expandable modular home exterior by ModuHaus

6M Container Home - Open Space

Open-plan foldable container home

Starting point

From$32,800

Best for

Studio accommodation

Configuration

Open space

An open-space 6M foldable container home for flexible studio, office, guest accommodation or modular living layouts.

Footprint

5.96 m x 5.96 m expanded

Model

0206

12M Portable Granny Flat with 3 Bedrooms expandable modular home exterior by ModuHaus

12M Portable Granny Flat with 3 Bedrooms

Three-bedroom expandable granny flat

Starting point

From$56,700

Best for

Family accommodation

Configuration

3 bedrooms

A larger 12M portable granny flat with three bedrooms, kitchen, bathroom and approximately 73.5 m2 of expanded living area.

Area

Approx. 73.5 m2

Approx. weight

6,110 kg

6M Container Home with 2 Bedrooms expandable modular home exterior by ModuHaus

6M Container Home with 2 Bedrooms

Two-bedroom compact foldable home

Starting point

From$34,289

Best for

Backyard accommodation

Configuration

2 bedrooms

A compact two-bedroom foldable container home with kitchen and bathroom for small living, guest accommodation or backyard use.

Area

Approx. 36 m2

Footprint

5.96 m x 5.8 m expanded

The Aspect expandable modular home exterior by ModuHaus

The Aspect

Premium two-bedroom expandable home

Starting point

From$44,500

Best for

Guest residence

Configuration

2 bedrooms

The most considered home in our expandable range — a two-bedroom design with elevated finishes, made to arrive in days and live like it always belonged.

Area

Approx. 37 m²

Format

Expandable, opens on site

The Clearing expandable modular home exterior by ModuHaus

The Clearing

Two-bedroom expandable home

Starting point

From$34,500

Best for

Guest cabin

Configuration

2 bedrooms

A practical, two-bedroom expandable home — a clear-headed way into flexible, relocatable living without stepping up to a full permanent build.

Area

Approx. 37 m²

Format

Expandable, opens on site

The Atelier expandable modular home exterior by ModuHaus

The Atelier

Compact plug-and-play studio

Starting point

From$26,500

Best for

Home office

Configuration

Studio · 1 bathroom

A compact, self-contained studio that arrives ready to level and connect — a calm room for working, hosting or retreating, set wherever you need it.

Area

Approx. 13.5 m²

Format

Plug-and-play, no unfolding

The pathway

What is a relocatable home?

A relocatable home is built off-site and delivered as a complete dwelling, with an installation approach that can allow it to move to a new location later. It differs from a permanent modular home fixed to engineered foundations.

The distinction matters because approval, finance and resale can vary with the product classification, service connections and how the home is installed on your site.

Terms that matter

Relocatable, transportable or modular unit?

These terms overlap. The practical question is whether the home is designed to move again or to become a permanent installation.

Transportable home

A complete home transported by road and set down on site. It may be fixed permanently or installed for future relocation.

Relocatable home

Designed and installed so it may move again, with services and footings planned for disconnection and transport.

Modular unit

A self-contained modular building that may be a compact home, studio, office or secondary dwelling.

Expandable home

A home that arrives compact and opens or grows on site. Explore the dedicated Expandable Homes collection for this pathway.

Why consider it

Why choose a relocatable home?

The key benefit is flexibility. A relocatable format can suit changing land, work or family circumstances, staged development and projects where a permanent foundation is not the intended long-term outcome.

Like other modular pathways, controlled factory construction can happen while site access and services are prepared. The final setup still depends on delivery, foundations or supports, services and local requirements.

Approval and finance

Relocatable home approvals in Australia

Requirements vary by state and council. A home installed permanently and connected to services may follow a different approval pathway from a genuinely movable dwelling. Occupation rules, classification and site controls should be checked before purchase.

Finance also depends on the lender and classification. The Planning Assessment and Council guide can help clarify the likely questions before you narrow the product conversation.

Planning next steps

Find the relocatable pathway that suits your site.

A Planning Assessment helps clarify intended use, access, services, budget and approval considerations before you commit to a product format.

Start a Planning AssessmentHow ModuHaus takes a project from brief to delivery

Questions before you begin

How much does a relocatable home cost in Australia?+

ModuHaus relocatable and modular homes start from $99,500 for the structure. Final cost depends on size, specification, site preparation, delivery distance, footings and service connections. A site-specific quote is the accurate way to budget a complete project.

Can you finance a relocatable home in Australia?+

Finance depends on classification and installation. A home installed as a fixed dwelling may follow a different lender pathway from a genuinely movable dwelling on a chassis. A broker experienced with modular and relocatable projects can help clarify the options.

Can a relocatable home be moved more than once?+

It may be possible when the home was designed and installed for relocation. Each move needs safe disconnection, transport and reinstallation planning. Homes fixed permanently to foundations are generally more complex and costly to move.

Do relocatable homes hold their value?+

Value can be less predictable than for a permanently installed modular home, because classification, condition, location and transportability all matter. A permanently installed home and a movable dwelling should be assessed differently for resale and finance purposes.