6M Container Home - 13FT with Bathroom expandable modular home exterior in Australia

Collection 19

6M Container Home - 13FT with Bathroom

Compact foldable home with bathroom

From$22,487AUD

Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

Enquire Now
View Specifications
Collection 19

Buyer summary

The practical details, before the deeper read.

Size and layout

~24 m2 · 1 bathroom

Best use

Guest suite, Studio, Site office

Starting price

From $22,487

Indicative only

Standard inclusions

Bathroom Package, Galvanised Steel Frame, Insulated Panels, Double-Glazed Windows

Exclusions, approval and site requirements

Key exclusions

Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

Approval pathway

Approval requirements vary by council, site and intended use. Documentation can be reviewed during the enquiry process, and any final approvals, inspections or site-specific reports should be confirmed before purchase.

Delivery and site requirements

Most foldable and expandable units are delivered in a compact folded format for efficient transport, then opened and installed on site. Setup timing depends on access, model selection, site conditions and required trades; typical setup is reviewed during enquiry.

6M Container Home - 13FT with Bathroom expandable modular home lifestyle exterior in Australia

01 / The model

A compact unit with essential bathroom functionality.

This 6M foldable model adds bathroom planning to a compact transport format, making it more functional than an empty shell while retaining layout flexibility.

It is suited to guest suites, studios, site offices, short-stay accommodation and temporary living where the final use and approvals can be reviewed early.

Essential services, flexible interior.+

The integrated bathroom gives the unit a more complete foundation, while the remaining space can be planned around its intended use.

It sits between a raw structure and a fully configured small home.

A useful option where bathroom access makes the difference between a room and a more complete space.

Bathroom planned in+

Includes wet/dry separated bathroom, cabinet, toilet and showerhead.

Approx. 24 m2+

A compact internal area for guest, office or studio use.

Flexible remaining space+

Plan furniture, storage or work zones around the intended use.

Foldable delivery+

Designed to transport compactly and expand on site.

02 / Interior and details

A practical interior, ready to be resolved around your use.

The layout, inclusions and finish level can be reviewed during enquiry so the model is matched to the site, intended use and required service connections.

6M Container Home - 13FT with Bathroom expandable modular home living area and interior layout
6M Container Home - 13FT with Bathroom fitted interior and service detail
6M Container Home - 13FT with Bathroom flexible accommodation interior

03 / Specifications

The details that shape the model.

Core model information is kept visible for quick comparison. Final dimensions and documentation are confirmed during enquiry.

Folded Size
4.00 m x 2.2 m x 2.5 m
Expanded Size
5.96 m x 4.00 m x 2.5 m
Living Area
Approx. 24 m2
Approx. Weight
2,560 kg
Frame
Galvanised steel structure
Walls
Fire-resistant EPS insulated panels
Windows
Double-glazed insulated tempered glass
Bathroom
Wet/dry separated bathroom, cabinet, toilet and showerhead

04 / What happens next

From first idea to moving day.

A guided journey, considered at every step.

How ModuHaus coordinates your project
  1. Enquire

    Tell us about your site, intended use and timing. We first confirm whether 6M Container Home - 13FT with Bathroom is a sensible product to assess further.

  2. Review

    We review product fit, access, services and the likely approval pathway, then identify the information still needed.

  3. Proposal

    You receive a clear scope covering the product, inclusions, delivery assumptions and the route to a site-specific quotation.

  4. Delivery

    Once documentation and responsibilities are confirmed, the factory, transport, site and installation pathway can be coordinated.

05 / Project essentials

The practical picture, in one place.

Standard inclusions

Bathroom PackageGalvanised Steel FrameInsulated PanelsDouble-Glazed Windows

Choose your next step

Three clear ways to move forward.

Start broad, enquire about this model, or keep it in your project while you compare.

Not sure what fits?

Start the Planning Assessment

Clarify your site, intended use, budget and timing before choosing a model.

Start Assessment

Know the product?

Send a guided enquiry

Share your location, timing and questions so the team can review this model in context.

Still comparing?

Save to My ModuHaus Project

Keep this model with your project and return when you are ready to ask questions.

Next Collection

6M Container Home with 2 Bedrooms - Glass Curtain Wall

6M Container Home with 2 Bedrooms - Glass Curtain Wall expandable modular home exterior by ModuHaus