
Collection 20
6M Container Home with 2 Bedrooms - Glass Curtain Wall
Two-bedroom home with glass wall
From$38,964AUD
Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

01 / The model
Compact living with a brighter edge.
This two-bedroom model adds a glass curtain wall on one side, helping the compact interior feel lighter and more connected to its setting.
The layout includes two bedrooms, living area, kitchen and bathroom in a foldable transport format suited to guest accommodation, small living, office use or retreat-style projects.
A small plan opened to the view.+
Glazing changes how a compact space feels. The curtain wall creates a stronger relationship between the interior and the landscape beyond.
The result is practical and compact, with a more architectural sense of openness.
Designed for buyers who want two bedrooms without losing the openness that makes a small space feel calm.
Glass curtain wall+
A brighter interior and stronger visual connection to outdoors.
Two-bedroom layout+
Bedroom separation within an efficient footprint.
Kitchen and bathroom+
Core living functions are included in the plan.
Modern presence+
A more contemporary facade than a plain utility shell.
02 / Interior and details
A practical interior, ready to be resolved around your use.
The layout, inclusions and finish level can be reviewed during enquiry so the model is matched to the site, intended use and required service connections.



03 / Specifications
The details that shape the model.
Core model information is kept visible for quick comparison. Final dimensions and documentation are confirmed during enquiry.
- Folded Size
- 5.96 m x 2.2 m x 2.5 m
- Folded / Shipping Size
- 5.96 m x 2.8 m x 2.5 m
- Approx. Weight
- 3,500 kg
- Frame
- Galvanised steel structure
- Walls
- Fire-resistant EPS panels
- Flooring
- 2 mm wear-resistant PVC floor leather
- Layout
- 2 bedrooms, 1 living room, 1 kitchen, 1 bathroom
- Kitchen
- Integrated kitchen with cabinets
- Bathroom
- Wet and dry separated bathroom
04 / What happens next
From first idea to moving day.
A guided journey, considered at every step.
How ModuHaus coordinates your projectEnquire
Tell us about your site, intended use and timing. We first confirm whether 6M Container Home with 2 Bedrooms - Glass Curtain Wall is a sensible product to assess further.
Review
We review product fit, access, services and the likely approval pathway, then identify the information still needed.
Proposal
You receive a clear scope covering the product, inclusions, delivery assumptions and the route to a site-specific quotation.
Delivery
Once documentation and responsibilities are confirmed, the factory, transport, site and installation pathway can be coordinated.
05 / Project essentials
The practical picture, in one place.
Standard inclusions
Optional upgrades
Kitchen cabinet sets with sink and appliances
Partition walls
Built-in storage or wardrobe units
Exterior cladding upgrades
Interior finish upgrades
What affects final pricing
Product configuration and selected finishes
Site access, foundations and installation requirements
Delivery distance and transport constraints
Council, certification and service-connection requirements
Confirm before site readiness
Delivery & Installation
Most foldable and expandable units are delivered in a compact folded format for efficient transport, then opened and installed on site. Setup timing depends on access, model selection, site conditions and required trades; typical setup is reviewed during enquiry.
Utilities
Water, electrical, plumbing and other service connections must be completed by licensed trades. HVAC, solar and off-grid systems are planned separately unless specifically quoted.
Warranty & Support
Warranty and support terms should be confirmed before purchase. Current product guidance includes support for structure, weatherproofing, internal fittings and manufacturing defects.
Council & Compliance
Approval requirements vary by council, site and intended use. Documentation can be reviewed during the enquiry process, and any final approvals, inspections or site-specific reports should be confirmed before purchase.
Approval guidance by state
Approval depends on location and intended use. Review the relevant state pathway before treating a model as suitable for a site.
Choose your next step
Three clear ways to move forward.
Start broad, enquire about this model, or keep it in your project while you compare.
Not sure what fits?
Start the Planning Assessment
Clarify your site, intended use, budget and timing before choosing a model.
Know the product?
Send a guided enquiry
Share your location, timing and questions so the team can review this model in context.
Still comparing?
Save to My ModuHaus Project
Keep this model with your project and return when you are ready to ask questions.
Next Collection
30FT Class 1A Compact House - 2 Bedroom
