6M Foldable Container Home - 6M-V4 expandable modular home exterior in Australia

Collection 24

6M Foldable Container Home - 6M-V4

Raw foldable structure

From$19,949AUD

Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

Enquire Now
View Specifications
Collection 24

Buyer summary

The practical details, before the deeper read.

Size and layout

Confirm during consultation · Multi-purpose use

Best use

Studio, Workshop, Storage room

Starting price

From $19,949

Indicative only

Standard inclusions

Foldable Steel Structure, Insulated Panels, Tempered Glass Windows, Wear-Resistant Flooring

Exclusions, approval and site requirements

Key exclusions

Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

Approval pathway

Approval requirements vary by council, site and intended use. Documentation can be reviewed during the enquiry process, and any final approvals, inspections or site-specific reports should be confirmed before purchase.

Delivery and site requirements

Most foldable and expandable units are delivered in a compact folded format for efficient transport, then opened and installed on site. Setup timing depends on access, model selection, site conditions and required trades; typical setup is reviewed during enquiry.

6M Foldable Container Home - 6M-V4 expandable modular home lifestyle exterior in Australia

01 / The model

A flexible structure for your own fit-out.

The 6M-V4 is best understood as a transportable shell rather than a fully fitted home.

It includes the foldable structure, insulated panels, windows, doors and durable flooring. Electrical and plumbing systems are not included and should be planned separately.

A simple shell, ready for a clear plan.+

Not every project needs a complete dwelling from day one. This model gives you a compact modular envelope that can be adapted around storage, work, studio or basic accommodation uses.

Because services are planned separately, the enquiry process should clarify the intended use before assumptions are made.

The raw structure gives you room to define the internal fit-out around the site and project.

Multi-purpose+

Suitable for office, workshop, storage, studio or accommodation planning.

Compact transport+

Folds down to a narrow transport footprint.

Fit-out freedom+

Services and layout can be planned separately.

Durable base+

Steel structure with insulated panels and reinforced flooring.

02 / Interior and details

A practical interior, ready to be resolved around your use.

The layout, inclusions and finish level can be reviewed during enquiry so the model is matched to the site, intended use and required service connections.

6M Foldable Container Home - 6M-V4 expandable modular home living area and interior layout
6M Foldable Container Home - 6M-V4 fitted interior and service detail
6M Foldable Container Home - 6M-V4 flexible accommodation interior

03 / Specifications

The details that shape the model.

Core model information is kept visible for quick comparison. Final dimensions and documentation are confirmed during enquiry.

Folded Size
L 5.85 m x W 0.75 m x H 2.5 m
Expanded Size
L 5.85 m x W 4.8 m x H 2.5 m
Approx. Weight
2,650 kg
Frame
Steel structure
Walls
50 mm or 70 mm flame-retardant foam insulated panels
Flooring
2 mm wear-resistant reinforced PVC floor leather
Windows
Double-layer tempered glass with plastic-steel or broken-bridge aluminium frame
Model Number
0208

04 / What happens next

From first idea to moving day.

A guided journey, considered at every step.

How ModuHaus coordinates your project
  1. Enquire

    Tell us about your site, intended use and timing. We first confirm whether 6M Foldable Container Home - 6M-V4 is a sensible product to assess further.

  2. Review

    We review product fit, access, services and the likely approval pathway, then identify the information still needed.

  3. Proposal

    You receive a clear scope covering the product, inclusions, delivery assumptions and the route to a site-specific quotation.

  4. Delivery

    Once documentation and responsibilities are confirmed, the factory, transport, site and installation pathway can be coordinated.

05 / Project essentials

The practical picture, in one place.

Standard inclusions

Foldable Steel StructureInsulated PanelsTempered Glass WindowsWear-Resistant Flooring

Choose your next step

Three clear ways to move forward.

Start broad, enquire about this model, or keep it in your project while you compare.

Not sure what fits?

Start the Planning Assessment

Clarify your site, intended use, budget and timing before choosing a model.

Start Assessment

Know the product?

Send a guided enquiry

Share your location, timing and questions so the team can review this model in context.

Still comparing?

Save to My ModuHaus Project

Keep this model with your project and return when you are ready to ask questions.

Next Collection

6M Container Home - Open Space

6M Container Home - Open Space expandable modular home exterior by ModuHaus