6M Container Home - Open Space expandable modular home exterior in Australia

Collection 25

6M Container Home - Open Space

Open-plan foldable container home

From$32,800AUD

Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

Enquire Now
View Specifications
Collection 25

Buyer summary

The practical details, before the deeper read.

Size and layout

Confirm during consultation · Open space layout · Studio / office use

Best use

Studio accommodation, Office, Guest accommodation

Starting price

From $32,800

Indicative only

Standard inclusions

Foldable Steel Structure, Insulated Panels, Tempered Glass Windows, Open-Plan Interior

Exclusions, approval and site requirements

Key exclusions

Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

Approval pathway

Approval requirements vary by council, site and intended use. Documentation can be reviewed during the enquiry process, and any final approvals, inspections or site-specific reports should be confirmed before purchase.

Delivery and site requirements

Most foldable and expandable units are delivered in a compact folded format for efficient transport, then opened and installed on site. Setup timing depends on access, model selection, site conditions and required trades; typical setup is reviewed during enquiry.

6M Container Home - Open Space expandable modular home lifestyle exterior in Australia

01 / The model

Open space for a more flexible plan.

The 6M Container Home - Open Space is designed for buyers who want a larger open interior rather than a fixed bedroom layout.

Its foldable structure, insulated panels and durable flooring make it a flexible base for residential, office, guest accommodation or outdoor mobile use, subject to site and approval requirements.

Freedom before final layout.+

A fixed layout can solve one problem and create another. This model keeps the interior open, giving you more control over how the space is divided and used.

The result is a practical modular base that can become a studio, office, guest space or simple accommodation unit after the right fit-out decisions are made.

The open-plan format supports a range of uses without locking the space too early.

Open layout+

A flexible interior for living, working, guest or storage plans.

Generous expanded size+

Expands to approx. 5.96 m x 5.96 m.

Fit-out options+

Can support room layouts, kitchen cabinetry and storage solutions.

Transport efficient+

Folds compactly before expanding on site.

02 / Interior and details

A practical interior, ready to be resolved around your use.

The layout, inclusions and finish level can be reviewed during enquiry so the model is matched to the site, intended use and required service connections.

6M Container Home - Open Space expandable modular home living area and interior layout
6M Container Home - Open Space fitted interior and service detail
6M Container Home - Open Space flexible accommodation interior
6M Container Home - Open Space expandable modular home exterior and entry detail

03 / Specifications

The details that shape the model.

Core model information is kept visible for quick comparison. Final dimensions and documentation are confirmed during enquiry.

Folded Size
5.96 m x 2.2 m x 2.5 m
Expanded Size
5.96 m x 5.96 m x 2.5 m
Approx. Weight
2,750 kg
Frame
Steel structure
Walls
50 mm or 70 mm flame-retardant foam insulated panels
Flooring
2 mm wear-resistant reinforced PVC floor leather
Windows
Double-layer tempered glass; plastic steel sliding or broken-bridge aluminium
Model Number
0206

04 / What happens next

From first idea to moving day.

A guided journey, considered at every step.

How ModuHaus coordinates your project
  1. Enquire

    Tell us about your site, intended use and timing. We first confirm whether 6M Container Home - Open Space is a sensible product to assess further.

  2. Review

    We review product fit, access, services and the likely approval pathway, then identify the information still needed.

  3. Proposal

    You receive a clear scope covering the product, inclusions, delivery assumptions and the route to a site-specific quotation.

  4. Delivery

    Once documentation and responsibilities are confirmed, the factory, transport, site and installation pathway can be coordinated.

05 / Project essentials

The practical picture, in one place.

Standard inclusions

Foldable Steel StructureInsulated PanelsTempered Glass WindowsOpen-Plan Interior

Choose your next step

Three clear ways to move forward.

Start broad, enquire about this model, or keep it in your project while you compare.

Not sure what fits?

Start the Planning Assessment

Clarify your site, intended use, budget and timing before choosing a model.

Start Assessment

Know the product?

Send a guided enquiry

Share your location, timing and questions so the team can review this model in context.

Still comparing?

Save to My ModuHaus Project

Keep this model with your project and return when you are ready to ask questions.

Next Collection

12M Portable Granny Flat with 3 Bedrooms

12M Portable Granny Flat with 3 Bedrooms expandable modular home exterior by ModuHaus