
Collection 26
12M Portable Granny Flat with 3 Bedrooms
Three-bedroom expandable granny flat
From$56,700AUD
Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

01 / The model
A larger modular plan for family-scale use.
This 12M portable granny flat is designed for customers who need more bedrooms and greater everyday usability than a compact 6M model.
With three bedrooms, kitchen cabinetry and a full bathroom, it can support families, guest accommodation, backyard living, offices, studios or commercial accommodation projects, subject to site-specific requirements.
More rooms, without a conventional build timeline.+
The 12M format gives the plan more breathing room while retaining the transport advantages of a foldable modular structure.
It is a practical option for buyers who need genuine separation between rooms and a more complete compact living layout.
Three bedrooms create flexibility for families, guests, rental-style use or project accommodation.
Three bedrooms+
A larger internal plan for family-scale accommodation.
Approx. 73.5 m2+
A generous expanded footprint for a foldable model.
Kitchen included+
Pre-installed cabinets are included in the source specification.
Service provisions+
Pre-connected water and electricity provisions noted in the source content.
02 / Interior and details
A practical interior, ready to be resolved around your use.
The layout, inclusions and finish level can be reviewed during enquiry so the model is matched to the site, intended use and required service connections.


03 / Specifications
The details that shape the model.
Core model information is kept visible for quick comparison. Final dimensions and documentation are confirmed during enquiry.
- Folded Size
- W 2.2 m x L 11.88 m x H 2.55 m
- Expanded Size
- W 6.19 m x L 11.88 m x H 2.55 m
- Living Area
- Approx. 73.5 m2
- Approx. Weight
- 6,110 kg
- Frame
- Galvanised steel structure
- Walls
- Fire-resistant EPS panels
- Windows
- Double-glazed glass
- Kitchen
- Pre-installed cabinets
- Bathroom
- Full bathroom with shower, toilet and vanity
- Utilities
- Pre-connected water and electricity provisions
04 / What happens next
From first idea to moving day.
A guided journey, considered at every step.
How ModuHaus coordinates your projectEnquire
Tell us about your site, intended use and timing. We first confirm whether 12M Portable Granny Flat with 3 Bedrooms is a sensible product to assess further.
Review
We review product fit, access, services and the likely approval pathway, then identify the information still needed.
Proposal
You receive a clear scope covering the product, inclusions, delivery assumptions and the route to a site-specific quotation.
Delivery
Once documentation and responsibilities are confirmed, the factory, transport, site and installation pathway can be coordinated.
05 / Project essentials
The practical picture, in one place.
Standard inclusions
What affects final pricing
Product configuration and selected finishes
Site access, foundations and installation requirements
Delivery distance and transport constraints
Council, certification and service-connection requirements
Confirm before site readiness
Delivery & Installation
Most foldable and expandable units are delivered in a compact folded format for efficient transport, then opened and installed on site. Setup timing depends on access, model selection, site conditions and required trades; typical setup is reviewed during enquiry.
Utilities
Water, electrical, plumbing and other service connections must be completed by licensed trades. HVAC, solar and off-grid systems are planned separately unless specifically quoted.
Warranty & Support
Warranty and support terms should be confirmed before purchase. Current product guidance includes support for structure, weatherproofing, internal fittings and manufacturing defects.
Council & Compliance
Approval requirements vary by council, site and intended use. Documentation can be reviewed during the enquiry process, and any final approvals, inspections or site-specific reports should be confirmed before purchase.
Approval guidance by state
Approval depends on location and intended use. Review the relevant state pathway before treating a model as suitable for a site.
Choose your next step
Three clear ways to move forward.
Start broad, enquire about this model, or keep it in your project while you compare.
Not sure what fits?
Start the Planning Assessment
Clarify your site, intended use, budget and timing before choosing a model.
Know the product?
Send a guided enquiry
Share your location, timing and questions so the team can review this model in context.
Still comparing?
Save to My ModuHaus Project
Keep this model with your project and return when you are ready to ask questions.
Next Collection
6M Container Home with 2 Bedrooms
