
Collection 27
6M Container Home with 2 Bedrooms
Two-bedroom compact foldable home
From$34,289AUD
Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

01 / The model
Two bedrooms in a compact modular footprint.
This 6M model provides approximately 36 m2 of usable space when expanded, including two bedrooms, kitchen and bathroom.
It is designed for buyers who need a smaller self-contained dwelling, backyard accommodation, holiday rental unit, office or flexible studio, subject to council and site requirements.
The essentials, planned efficiently.+
Every square metre has a job: sleeping, cooking, bathing or gathering. The value is in keeping the plan compact without stripping away daily function.
The foldable format supports efficient delivery while still opening into a practical two-bedroom layout on site.
Two bedrooms make the model useful for guests, family overflow, work-stay arrangements or compact independent living.
Two bedrooms+
A more private layout than an open studio or single-room pod.
Kitchen included+
Open kitchen with cabinets included in the source specification.
Full bathroom+
Bathroom with toilet, shower and vanity functionality.
Compact living+
Approx. 36 m2 of expanded usable space.
02 / Interior and details
A practical interior, ready to be resolved around your use.
The layout, inclusions and finish level can be reviewed during enquiry so the model is matched to the site, intended use and required service connections.




03 / Specifications
The details that shape the model.
Core model information is kept visible for quick comparison. Final dimensions and documentation are confirmed during enquiry.
- Folded Size
- 5.96 m x 2.2 m x 2.5 m
- Expanded Size
- 5.96 m x 5.8 m x 2.5 m
- Living Area
- Approx. 36 m2
- Approx. Weight
- 3,500 kg
- Frame
- Galvanised steel structure
- Walls
- Fire-resistant EPS insulated panels
- Flooring
- 2 mm wear-resistant PVC
- Windows
- Double-glazed insulated tempered glass
- Kitchen
- 1 kitchen with cabinets
- Bathroom
- Wet/dry separated bathroom, cabinet, toilet and showerhead
04 / What happens next
From first idea to moving day.
A guided journey, considered at every step.
How ModuHaus coordinates your projectEnquire
Tell us about your site, intended use and timing. We first confirm whether 6M Container Home with 2 Bedrooms is a sensible product to assess further.
Review
We review product fit, access, services and the likely approval pathway, then identify the information still needed.
Proposal
You receive a clear scope covering the product, inclusions, delivery assumptions and the route to a site-specific quotation.
Delivery
Once documentation and responsibilities are confirmed, the factory, transport, site and installation pathway can be coordinated.
05 / Project essentials
The practical picture, in one place.
Standard inclusions
Optional upgrades
Kitchen cabinetry options
Internal partitions
Storage solutions
Exterior cladding upgrades
Interior finish upgrades
What affects final pricing
Product configuration and selected finishes
Site access, foundations and installation requirements
Delivery distance and transport constraints
Council, certification and service-connection requirements
Confirm before site readiness
Delivery & Installation
Most foldable and expandable units are delivered in a compact folded format for efficient transport, then opened and installed on site. Setup timing depends on access, model selection, site conditions and required trades; typical setup is reviewed during enquiry.
Utilities
Water, electrical, plumbing and other service connections must be completed by licensed trades. HVAC, solar and off-grid systems are planned separately unless specifically quoted.
Warranty & Support
Warranty and support terms should be confirmed before purchase. Current product guidance includes support for structure, weatherproofing, internal fittings and manufacturing defects.
Council & Compliance
Approval requirements vary by council, site and intended use. Documentation can be reviewed during the enquiry process, and any final approvals, inspections or site-specific reports should be confirmed before purchase.
Approval guidance by state
Approval depends on location and intended use. Review the relevant state pathway before treating a model as suitable for a site.
06 / Product questions
Common questions, answered simply.
How is the home delivered?+
It is delivered in a folded format for efficient transport, then expanded and installed on site. Setup timing depends on access and site conditions.
Can it connect to power and water?+
Yes. The unit is designed with water and electrical connection provisions. Licensed trades are required for all service connections.
Does it require council approval?+
Approval requirements vary by state, council area, site and intended use. Customers should check with their local council before purchase.
Choose your next step
Three clear ways to move forward.
Start broad, enquire about this model, or keep it in your project while you compare.
Not sure what fits?
Start the Planning Assessment
Clarify your site, intended use, budget and timing before choosing a model.
Know the product?
Send a guided enquiry
Share your location, timing and questions so the team can review this model in context.
Still comparing?
Save to My ModuHaus Project
Keep this model with your project and return when you are ready to ask questions.
Next Collection
The Aspect
