
Collection 18
13FT Container Office
Compact office pod with bathroom
From$15,303AUD
Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

01 / The model
A compact room with more utility than its footprint suggests.
The 13FT Container Office is a small, durable and self-contained space for customers who do not need a larger modular home.
Its insulated structure, wear-resistant flooring and bathroom with shower make it suitable for work, site use, guest accommodation or temporary shelter, subject to site-specific requirements.
Small, durable and easy to place.+
This model is intentionally compact: a standalone room that can support focused work, short stays or project use.
The bathroom gives it more independence than a basic office pod while keeping the overall footprint restrained.
Use it where a full home is too much, but a basic room is not enough.
Backyard work+
A focused workspace separated from the main home.
Site office+
A compact, durable room for commercial or project use.
Guest support+
Bathroom functionality makes short-stay use more practical.
Fast deployment+
A small footprint helps simplify access and placement.
02 / Interior and details
A practical interior, ready to be resolved around your use.
The layout, inclusions and finish level can be reviewed during enquiry so the model is matched to the site, intended use and required service connections.



Floor planEvery metre, considered.+

Indicative floor plan supplied for 13FT Container Office.
03 / Specifications
The details that shape the model.
Core model information is kept visible for quick comparison. Final dimensions and documentation are confirmed during enquiry.
- Expanded Size
- 3.96 m x 2.22 m x 2.42 m
- Living Area
- Approx. 8 m2
- Approx. Weight
- 1,350 kg
- Frame
- Galvanised steel structure
- Walls
- Fire-resistant EPS insulated panels
- Flooring
- High-quality wear-resistant material
- Windows
- Thermal break aluminium windows
- Bathroom
- Bathroom with shower
04 / What happens next
From first idea to moving day.
A guided journey, considered at every step.
How ModuHaus coordinates your projectEnquire
Tell us about your site, intended use and timing. We first confirm whether 13FT Container Office is a sensible product to assess further.
Review
We review product fit, access, services and the likely approval pathway, then identify the information still needed.
Proposal
You receive a clear scope covering the product, inclusions, delivery assumptions and the route to a site-specific quotation.
Delivery
Once documentation and responsibilities are confirmed, the factory, transport, site and installation pathway can be coordinated.
05 / Project essentials
The practical picture, in one place.
Standard inclusions
Optional upgrades
Built-in storage
Wardrobe units
Optional cladding upgrades
Optional finish upgrades
What affects final pricing
Product configuration and selected finishes
Site access, foundations and installation requirements
Delivery distance and transport constraints
Council, certification and service-connection requirements
Confirm before site readiness
Delivery & Installation
Most foldable and expandable units are delivered in a compact folded format for efficient transport, then opened and installed on site. Setup timing depends on access, model selection, site conditions and required trades; typical setup is reviewed during enquiry.
Utilities
Water, electrical, plumbing and other service connections must be completed by licensed trades. HVAC, solar and off-grid systems are planned separately unless specifically quoted.
Warranty & Support
Warranty and support terms should be confirmed before purchase. Current product guidance includes support for structure, weatherproofing, internal fittings and manufacturing defects.
Council & Compliance
Approval requirements vary by council, site and intended use. Documentation can be reviewed during the enquiry process, and any final approvals, inspections or site-specific reports should be confirmed before purchase.
Approval guidance by state
Approval depends on location and intended use. Review the relevant state pathway before treating a model as suitable for a site.
Choose your next step
Three clear ways to move forward.
Start broad, enquire about this model, or keep it in your project while you compare.
Not sure what fits?
Start the Planning Assessment
Clarify your site, intended use, budget and timing before choosing a model.
Know the product?
Send a guided enquiry
Share your location, timing and questions so the team can review this model in context.
Still comparing?
Save to My ModuHaus Project
Keep this model with your project and return when you are ready to ask questions.
Next Collection
6M Container Home - 13FT with Bathroom
