The Clearing expandable modular home exterior in Australia

Collection 29

The Clearing

Two-bedroom expandable home

From$34,500AUD

Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

Enquire Now
View Specifications
Collection 29

Buyer summary

The practical details, before the deeper read.

Size and layout

~37 m² · 2 bedrooms · 1 bathrooms

Best use

Guest cabin, Holiday accommodation, Off-grid-ready retreat

Starting price

From $34,500

Indicative only

Standard inclusions

Two-Bedroom Layout, Kitchenette with Storage, Stone-Look Benchtop, Full Bathroom

Exclusions, approval and site requirements

Key exclusions

Indicative starting price. Final pricing depends on site, delivery, inclusions and approvals.

Approval pathway

Approval requirements vary by council, site and intended use. Documentation can be reviewed during the enquiry process, and any final approvals, inspections or site-specific reports should be confirmed before purchase.

Delivery and site requirements

Most foldable and expandable units are delivered in a compact folded format for efficient transport, then opened and installed on site. Setup timing depends on access, model selection, site conditions and required trades; typical setup is reviewed during enquiry.

The Clearing expandable modular home lifestyle exterior in Australia

01 / The model

Flexible living, simply done.

The Clearing is the most straightforward way into the expandable range. Around 37 square metres open out on site into two bedrooms, a kitchenette, a full bathroom and a light-filled living space.

It is designed for buyers who want a complete, comfortable small home — a guest cabin, off-grid-ready retreat or relocatable residence — without the cost or timeline of a conventional build.

Everything you need, nothing you don't.+

Every square metre earns its place: room to sleep, cook, bathe and gather, with soft-close cabinetry, a stone-look benchtop and durable flooring that wears gracefully.

The expandable format keeps transport simple and the on-site footprint efficient, so the home travels compact and opens into a calm, practical plan.

Two bedrooms and a full fit-out make The Clearing equally suited to guest stays, holiday lets, rural retreats and compact everyday living.

Two-bedroom plan+

A real separation of spaces in an efficient, relocatable footprint.

Complete fit-out+

Kitchenette, full bathroom and service-ready connections from the outset.

Cost-effective entry+

The most accessible way into flexible, relocatable living.

Off-grid ready+

A practical base for independent systems, subject to design.

02 / Interior and details

A practical interior, ready to be resolved around your use.

The layout, inclusions and finish level can be reviewed during enquiry so the model is matched to the site, intended use and required service connections.

The Clearing expandable modular home living area and interior layout
The Clearing fitted interior and service detail
The Clearing flexible accommodation interior
The Clearing expandable modular home exterior and entry detail
The Clearing expandable modular home expanded modular layout
Floor planEvery metre, considered.+
The Clearing floor plan showing expandable modular layout

Indicative floor plan supplied for The Clearing.

03 / Specifications

The details that shape the model.

Core model information is kept visible for quick comparison. Final dimensions and documentation are confirmed during enquiry.

Configuration
2 bedrooms · 1 bathroom · kitchenette · living
Internal area
Approx. 37 m² once expanded
Set-up footprint
Approx. 5.85 m × 6.3 m
Format
Expandable — ships compact, opens on site
Option
Dividing bedroom wall can be removed for one larger room

04 / What happens next

From first idea to moving day.

A guided journey, considered at every step.

How ModuHaus coordinates your project
  1. Enquire

    Tell us about your land, intended use and timing. We confirm whether this model is a natural fit.

  2. Consult

    We review access, services and the approval pathway together, and shape the home around how you'll live.

  3. Proposal

    You receive a clear, itemised proposal — inclusions, delivery and the route to approval, with no surprises.

  4. Delivery

    Supplier, delivery and placement requirements are confirmed through project review, then connection is completed by licensed trades where required.

05 / Project essentials

The practical picture, in one place.

Standard inclusions

Two-Bedroom LayoutKitchenette with StorageStone-Look BenchtopFull BathroomDouble-Glazed WindowsSoft-Close JoineryRemovable Dividing Wall (option)

06 / Product questions

Common questions, answered simply.

How does The Clearing differ from The Aspect?+

Both share the same two-bedroom expandable format. The Clearing is the practical, value-focused model; The Aspect adds premium kitchen, bathroom and exterior finishes.

Can the layout be opened up?+

Yes. The dividing bedroom wall can be omitted to create a single, larger room — a good option for studios or open living. We'll confirm the right layout during consultation.

Choose your next step

Three clear ways to move forward.

Start broad, enquire about this model, or keep it in your project while you compare.

Not sure what fits?

Start the Planning Assessment

Clarify your site, intended use, budget and timing before choosing a model.

Start Assessment

Know the product?

Send a guided enquiry

Share your location, timing and questions so the team can review this model in context.

Still comparing?

Save to My ModuHaus Project

Keep this model with your project and return when you are ready to ask questions.

Next Collection

The Atelier

The Atelier expandable modular home exterior by ModuHaus